| Plan Review Notes For Permit 16061076 |
| Permit Number |
16061076 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-06-21 14:25:19 | 1ST REVIEW | | | | | | | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER LL | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES | | | BUILDING DIVISION | | | 561-805-6711 | | | [email protected] | | | | | | | | | PLUMBING COMMENTS: | | | | | | 1. WHAT TYPE OF T+P ARE YOU USING TO COMPLY WITH FBC | | | MECH SEC. 1402.5.1 PRESSURE AND TEMPERATURE. | | | SOLAR ENERGY SYSTEM COMPONENTS CONTAINING PRESSURIZED | | | FLUIDS SHALL BE PROTECTED AGAINST PRESSURES AND | | | TEMPERATURES EXCEEDING DESIGN LIMITATIONS WITH A | | | PRESSURE AND TEMPERATURE RELIEF VALVE. EACH SECTION OF | | | THE SYSTEM IN WHICH EXCESSIVE PRESSURES ARE CAPABLE OF | | | DEVELOPING SHALL HAVE A RELIEF DEVICE LOCATED SO THAT A | | | SECTION CANNOT BE VALVED OFF OR OTHERWISE ISOLATED FROM | | | A RELIEF DEVICE. RELIEF VALVES SHALL COMPLY WITH THE | | | REQUIREMENTS OF SECTION 1006.4 AND DISCHARGE IN | | | ACCORDANCE WITH SECTION 1006.6. | | | | | | 2. PROVIDE A VACUM RELIEF VALVE .PER FBC MECH. 1402.5.2 | | | VACUUM. | | | THE SOLAR ENERGY SYSTEM COMPONENTS THAT ARE SUBJECTED | | | TO A VACUUM WHILE IN OPERATION OR DURING SHUTDOWN SHALL | | | BE DESIGNED TO WITHSTAND SUCH VACUUM OR SHALL BE | | | PROTECTED WITH VACUUM RELIEF VALVES. | | | | | | 3. SYSTEM SHALL COMPLY WITH FBC MECH. SEC. 1402.5.3 | | | PROTECTION FROM FREEZING. | | | SYSTEM COMPONENTS SHALL BE PROTECTED FROM DAMAGE BY | | | FREEZING OF HEAT TRANSFER LIQUIDS AT THE LOWEST AMBIENT | | | TEMPERATURES THAT WILL BE ENCOUNTERED DURING THE | | | OPERATION OF THE SYSTEM |
|