| Date |
Text |
| 2016-07-20 15:48:56 | 1ST REVIEW |
| | |
| | |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER LL |
| | CITY OF WEST PALM BEACH |
| | DEVELOPMENT SERVICES |
| | BUILDING DIVISION |
| | 561-805-6711 |
| | [email protected] |
| | |
| | |
| | PLUMBING COMMENTS: |
| | |
| | 1. SHT. P-301 PLEASE PROVIDE PLUMBING FIXTURE SCHEDULE. |
| | PER WPB AMEND.TO FBC SEC. 107.2.1 |
| | |
| | 2. SHT. P-101 IT APPEARS YOU MOVED THE MOP SINK ON THE |
| | FIRST FLOOR AT GRID LINES A-5.3 AND B5.3 IT IS NOT |
| | CLEAR ON THE FLOOR PLAN PLEASE CLOUD EVERY CHANGE. PER |
| | WPB AMEND.TO FBC SEC. 107.2.1 |
| | |
| | 3. SHT. P202.1 THE 2IN. FITTING ON THE VENT FOR TROUGH |
| | DRAIN IS SHOWN IN THE WRONG FLOW DIRECTION. PER WPB |
| | AMEND.TO FBC SEC. 107.2.1 |
| | |
| | 4. SHT. P202.1 THE VENT FOR THE MOP SINK ON FIRST FLOOR |
| | NEEDS TO CONNECT VERTICALLY TO TO HORIZONTAL DRAIN |
| | SHALL COMPLY WITHE FBC PL SEC. 905.3 VENT CONNECTION TO |
| | DRAINAGE SYSTEM. |
| | EVERY DRY VENT CONNECTING TO A HORIZONTAL DRAIN SHALL |
| | CONNECT ABOVE THE CENTERLINE OF THE HORIZONTAL DRAIN |
| | PIPE. |
| | |
| | 905.4 VERTICAL RISE OF VENT. |
| | EVERY DRY VENT SHALL RISE VERTICALLY TO A POINT NOT |
| | LESS THAN 6 INCHES (152 MM) ABOVE THE FLOOD LEVEL RIM |
| | OF THE HIGHEST TRAP OR TRAPPED FIXTURE BEING VENTED. |
| | |
| | 5.SHT. P 202.1 THE LAV STACK NEXT TO URINAL CAN NOT |
| | REDUCE IN SIZE FROM 2IN TO 11/2 AND BACK TO 2IN. |
| | |
| | 6. SHT. P201.1 A NOTE SHOW CONDENSATE DRAIN IN WALL TO |
| | DISCHARGE INTO FLOOR SINK CONDENSATE SHALL NOT |
| | DISCHARGE INTO SANITARY SYSTEM. PER FBC SEC. [M] |
| | 314.2.1 / WPB CODE OF ORD. SEC. 90-126.(5) |
| | |
| | 7. SHT. P203 THE 2IN VENTS FOR THE FLOOR SINKS ARE |
| | HORIZONTAL DRY VENTS WHICH ARE NOT ALLOWED THEY SHALL |
| | COMPLY WITH FBC PL SEC. 905.3-905.4 |
| | |
| | 8. SHT. P201.1/ P301 THESE EQUIPMENT NUMBERS ARE |
| | MISSING ON THE PLUMBING EQUIPMENT SCHEDULE 3.13, 2.12, |
| | 2.13, 2.14 .PLEASE CLARIFY PER WPB AMEND.TO FBC SEC. |
| | 107.2.1 |
| | |
| | 9. SHT. 201.1 THE EQUIPMENT NUMBERS ARE MISSING 5.02, |
| | 5.03, 5.04, 5.05, 5.06, 5.07, 3.27 PLEASE CLARIFY PER |
| | WPB AMEND.TO FBC SEC. 107.2.1 |
| | |
| | 10. SHOW FLOW ARROWS ON HOT WATER RECIRCULATION SYSTEM. |
| | PER WPB AMEND.TO FBC SEC. 107.2.1 |
| | |
| | 11. PROVIDE MANUFACTURE SPEC AND INSTILLATION GUIDES |
| | FOR TANKLESS HEATERS AND VENTS. PER WPB AMEND.TO FBC |
| | SEC. 107.2.1 |
| | |
| | 12. PROVIDE DETAIL FOR VENTING ON TANKLESS HEATERS. PER |
| | WPB AMEND.TO FBC SEC. 107.2.1 |
| | |
| | 13. THE HAND SINKS IN KITCHEN SHALL DISCHARGE INTO |
| | SANITARY NOT THE GREASE SYSTEM. PER FBC PL |
| | 1003.3.1/1003.2 |
| | |
| | 14. SHT. P206 SHOW SQFT ON STORM RISER DIAGRAM. PER WPB |
| | AMEND.TO FBC SEC. 107.2.1 |
| | |
| | |
| | DUE TO THE DEFICIENCIES OF THIS PLAN A COMPLETE AND |
| | THOROUGH REVIEW CANNOT BE DONE AT THIS TIME. UPON |
| | RESUBMITTAL THERE MAYBE ADDITIONAL COMMENTS |
| | |
| | WHEN RESUBMITTING PLANS, REMOVE AND REPLACE ANY PAGES |
| | AS NECESSARY. A NARRATIVE LISTING THE ORIGINAL REVIEW |
| | COMMENT NUMBER WITH A DESCRIPTION OF THE CHANGES MADE |
| | AND IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE |
| | THE CHANGE CAN BE FOUND WILL HELP EXPEDITE THE REVIEW. |
| | |
| | |
| | |
| | |
| | |
| | |
| | |