Plan Review Notes
Plan Review Notes For Permit 16061051
Permit Number 16061051
Review Stop M
Sequence Number 1
Notes
Date Text
2016-07-08 08:40:541ST REVIEW: FBC 2014 MECHANICAL
 PERMIT REVISION #16061051
 MASTER PERMIT #15091225
 RESTORATION HARDWARE
 7/6/2016
  
 1) PLEASE PROVIDE A SHEET-BY-SHEET NARRATIVE ITEMIZING
 ALL CHANGES MADE TO THE ORIGINAL MECHANICAL PLANS.
 PLACE CLOUDS AND DELTA TRIANGLE SYMBOLS ON THE REVISED
 PLANS TO HIGHLIGHT ALL CHANGES SUCH AS THE NEW AND
 RELOCATED VRV'S AND DUCT WORK, THE NEW EXHAUST FANS,
 THE NEW HEAT PUMPS AND OAI UNITS ETC.
  
 2) SUBMIT REVISED AC COOLING AND HEATING CALCULATIONS
 FOR ALL SYSTEMS INCLUDING THE NEW HEAT PUMPS- 9 & 10,
 AND THE DUCTLESS TRASH ROOM AC SYSTEM SECTION C403.2.1
 FBC-14 ENERGY CONSERVATION.
  
 3) SUBMIT REVISED ENERGY CALCULATIONS PER SECTION
 C401.2
  
 4) ADVISORY: SEPARATE PERMITS ARE REQUIRED FOR THE
 KITCHEN EXHAUST HOODS AND FIRE SUPPRESSION SYSTEMS.
 PLEASE PLACE A NOTE ON THE PLAN ACCORDINGLY.
  
 5) PROVIDE COMPLETE KITCHEN PLANS AND A KITCHEN
 EQUIPMENT SCHEDULE. CLARIFY IF WALK-IN COOLERS AND
 FREEZERS ARE TO BE INSTALLED AND SHOW THEIR LOCATIONS
 ON THE PLANS (SEPARATE PERMITS REQUIRED FOR WALK-INS
 AND REFRIGERATION). PLEASE NOTE IF GAS-FIRED COOKING
 APPLIANCES ARE TO BE INSTALLED, A GAS PIPING ISOMETRIC
 DRAWING AND COMBUSTION AIR CALCULATIONS WILL BE
 REQUIRED FOR REVIEW- SEE
 SECTIONS 304 & 401 FBC-14 FUEL GAS.
  
 6) REFER TO TABLE 403.3 AND PROVIDE EXHAUST VENTILATION
 CALCULATIONS FOR THE KITCHEN, THE TRASH ROOM, THE
 COOKING OIL STORAGE ROOM, AND THE JANITOR'S CLOSET- SEE
 THE NEW EF SCHEDULE ON SHEET M.401.
  
 7) PROVIDE AIR BALANCE CALCULATIONS FOR LEVEL-4.
  
 8) PROVIDE AN EQUIPMENT SCHEDULE FOR MUA-1.
  
 9) SHEET M-101: PROVIDE INDEPENDENT VENTILATION OR AC
 SYSTEMS FOR THE ELEVATOR CONTROL ROOMS 194 & 197.
  
 10) M-101: INDICATE THE REQUIRED CLEARANCES FOR THE
 EF-12 TERMINATION SHOWN AT THE NORTH SIDE- SEE SECTION
 501.3.1, AND PROVIDE A FLORIDA PRODUCT APPROVAL OR
 MIAMI-DADE NOA FOR THE EXHAUST LOUVER WITH SHOP DRAWING
 APPROVAL BY THE ENGINEER OF RECORD.
  
 11) M-101: KEYED NOTE #7 IS MISSING AT THE NORTH SHAFT.
  
 12) M-101, 102, 103, & 104: BECAUSE EACH FLOOR HAS A
 COMMON PLENUM, DUCT SMOKE DETECTORS ARE REQUIRED IN THE
 RETURN AIR SYSTEMS OF ALL VRV'S SHOWN ON THE PLAN-
 REFER TO SECTION 606.2.2. PLACE A SD SYMBOL AT EACH VRV
 LOCATION.
  
 13) M-101, 102, 103, 104: PROVIDE EQUIPMENT SCHEDULES
 AND SUBMITTALS FOR THE F/S DAMPERS AND ACCESS DOORS.
 SHOW THE DUCT CONNECTIONS TO THE FLOOR GRILLS ON THE
 4TH LEVEL AT THE WINE VAULT AREAS, AND PROVIDE DETAILS
 FOR INSTALLATION OF FIRE DAMPERS AT THESE LOCATIONS.
  
 14) M-103: THE 24X16 TRANSFER GRILL CONVEYING 1500 CFMS
 FROM THE RETAIL AREA IS UNDERSIZED PER SECTION 601.5:
 50 SQUARE INCHES PER 100 CFM IS REQUIRED.
  
 15) M-104: PLEASE CLEARLY LABEL THE KITCHEN HOOD
 EXHAUST AND MAKE UP AIR DUCTS AT THE HOOD LOCATION.
  
 16) M-104: REMOVE THE NOTE INDICATING O/A DUCT
 CONNECTION FROM OAI-1 TO VRV-48. VRV-48 HAS O/A SUPPLY
 FROM OAI-4.
  
 17) M-104: MOTORIZED DAMPERS ARE REQUIRED FOR THE O/A
 INTAKE DUCTS FOR THE 4TH FLOOR VRV'S- REFER TO SECTION
 C404.2.4.4 FBC-14 ENERGY CONSERVATION.
  
 18) M-104: DEMAND CONTROLLED VENTILATION IS REQUIRED
 FOR THE DINING AND WINE VAULT AREAS PER SECTION
 C403.2.5.1. PROVIDE A SYSTEM THAT MEETS COMPLIANCE.
  
 19) M-402: THE OUTSIDE AIR SCHEDULE APPEARS TO SHOW
 DEFICIENCIES IN SOME OF THE PROVIDED O/A CFMS WHEN
 COMPARED WITH THE CFMS SHOWN AS REQUIRED.
  
 20) ADVISORY: COPIED BELOW ARE THE PROVISOS FROM THE
 MASTER PERMIT #15091225. THESE WIIL NOW APPLY TO THIS
 REVISION PERMIT #16061051.
  
 IN ADDITION PLEASE NOTE THAT THE ENGINEER'S LETTERS TO
 THE BUILDING OFFICIAL REGARDING THE AC STANDS AND
 REMOVABLE PLATFORMS THAT WERE SUBMITTED UNDER THE
 MASTER PERMIT MUST BE MODIFIED AND ATTACHED TO THIS
 REVISION PERMIT APPLICATION.
  
 MECHANICAL PROVISOS:
 PERMIT #15091225
 2/18/16
  
 1 ) C408.2 FBC-14 ENERGY CONSERVATION: MECHANICAL
 SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS.
 PRIOR TO PASSING THE FINAL MECHANICAL INSPECTION, THE
 REGISTERED DESIGN PROFESSIONAL SHALL PROVIDE EVIDENCE
 OF MECHANICAL SYSTEMS COMMISSIONING AND COMPLETION IN
 ACCORDANCE THE PROVISIONS OF THIS SECTION.
 CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE
 PROVISIONS FOR COMMISSIONING AND COMPLETION
 REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE
 PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER
 REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE
 GIVEN TO THE OWNER AND MADE AVAILABLE TO THE CODE
 OFFICIAL UPON REQUEST IN ACCORDANCE WITH SECTIONS
 C408.2.4 AND C408.2.5.
 A) C408.2.1 COMMISSIONING PLAN.
 A COMMISSIONING PLAN SHALL BE DEVELOPED BY A REGISTERED
 DESIGN PROFESSIONAL OR APPROVED AGENCY AND SHALL
 INCLUDE THE FOLLOWING ITEMS:
 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL
 BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING,
 INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF
 THE ACTIVITIES.
 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR
 SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO
 BE PERFORMED.
 3. FUNCTIONS TO BE TESTED, INCLUDING, BUT NOT LIMITED
 TO CALIBRATIONS AND ECONOMIZER CONTROLS.
 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED.
 AT A MINIMUM, TESTING SHALL AFFIRM WINTER AND SUMMER
 DESIGN CONDITIONS AND FULL OUTSIDE AIR CONDITIONS.
 5. MEASURABLE CRITERIA FOR PERFORMANCE.
  
 B) C408.2.2 AIR DISTRIBUTION SYSTEM TESTING, ADJUSTING
 AND BALANCING.
 CONSTRUCTION DOCUMENTS SHALL REQUIRE THAT A WRITTEN
 BALANCE REPORT BE PROVIDED TO THE OWNER OR THE
 DESIGNATED REPRESENTATIVE OF THE BUILDING OWNER FOR
 HVAC SYSTEMS SERVING ZONES WITH A TOTAL CONDITIONED
 AREA EXCEEDING 5000 SQUARE FEET (465 M2). AIR
 DISTRIBUTION SYSTEMS SHALL BE TESTED, ADJUSTED, AND
 BALANCED BY A LICENSED ENGINEER OR A COMPANY OR
 INDIVIDUAL HOLDING A CURRENT CERTIFICATION FROM A
 RECOGNIZED TESTING AND BALANCING AGENCY ORGANIZATION IN
 ACCORDANCE WITH GENERALLY ACCEPTED ENGINEERING
 STANDARDS.
  
 C) C408.2.4 PRELIMINARY COMMISSIONING REPORT.
 A PRELIMINARY REPORT OF COMMISSIONING TEST PROCEDURES
 AND RESULTS SHALL BE COMPLETED AND CERTIFIED BY THE
 REGISTERED DESIGN PROFESSIONAL OR APPROVED AGENCY AND
 PROVIDED TO THE BUILDING OWNER. THE REPORT SHALL BE
 IDENTIFIED AS ?PRELIMINARY COMMISSIONING REPORT? AND
 SHALL IDENTIFY:
 1. ITEMIZATION OF DEFICIENCIES FOUND DURING TESTING
 REQUIRED BY THIS SECTION THAT HAVE NOT BEEN CORRECTED
 AT THE TIME OF REPORT PREPARATION.
 2. DEFERRED TESTS THAT CANNOT BE PERFORMED AT THE TIME
 OF REPORT PREPARATION BECAUSE OF CLIMATIC CONDITIONS.
 3. CLIMATIC CONDITIONS REQUIRED FOR PERFORMANCE OF THE
 DEFERRED TESTS.
  
 D) C408.2.4.1 ACCEPTANCE OF REPORT.
 BUILDINGS, OR PORTIONS THEREOF, SHALL NOT PASS THE
 FINAL MECHANICAL INSPECTION UNTIL SUCH TIME AS THE CODE
 OFFICIAL HAS RECEIVED A LETTER OF TRANSMITTAL FROM THE
 BUILDING OWNER ACKNOWLEDGING THAT THE BUILDING OWNER
 HAS RECEIVED THE PRELIMINARY COMMISSIONING REPORT.
  
 E) C408.2.4.2 COPY OF REPORT.
 THE CODE OFFICIAL SHALL BE PERMITTED TO REQUIRE THAT A
 COPY OF THE PRELIMINARY COMMISSIONING REPORT BE MADE
 AVAILABLE FOR REVIEW BY THE CODE OFFICIAL.
  
 F) C408.2.5.4 FINAL COMMISSIONING REPORT.
 A REPORT OF TEST PROCEDURES AND RESULTS IDENTIFIED AS
 "FINAL COMMISSIONING REPORT" SHALL BE DELIVERED TO THE
 BUILDING OWNER AND SHALL INCLUDE:
 1. RESULTS OF FUNCTIONAL PERFORMANCE TESTS.
 2. DISPOSITION OF DEFICIENCIES FOUND DURING TESTING,
 INCLUDING DETAILS OF CORRECTIVE MEASURES USED OR
 PROPOSED.
 3. FUNCTIONAL PERFORMANCE TEST PROCEDURES USED DURING
 THE COMMISSIONING PROCESS INCLUDING MEASURABLE CRITERIA
 FOR TEST ACCEPTANCE, PROVIDED HEREIN FOR REPEATABILITY.
 EXCEPTION: DEFERRED TESTS WHICH CANNOT BE PERFORMED AT
 THE TIME OF REPORT PREPARATION DUE TO CLIMATIC
 CONDITIONS.
  
 2) DEFERRED SUBMITTAL: 107.3.4.2 DEFERRED SUBMITTALS.
 FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS
 ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE
 NOT SUBMITTED AT THE TIME OF THE
 APPLICATION AND THAT ARE TO BE SUBMITTED TO THE
 BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL
 OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF
 THE BUILDING OFFICIAL. THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE
 DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR
 REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
 A) DEFERRED SUBMITTAL. 2010 FBC 107.3.4.1 PRODUCT
 APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED BY THE
 DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN
 WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL
 FOR JURISDICTIONAL APPROVAL.
  
 3) FINAL APPROVAL OF THE ALTERNATE METHOD OF
 CONSTRUCTION OF THE ACCESS PANELS FOR ABOVE CEILING AC
 EQUIPMENT MECHANICAL IS CONTINGENT ON A LETTER OF
 ACKNOWLEDGEMENT FROM THE RESTORATION HARDWARE FACILITY
 MANAGER, AND YOU ALSO INCLUDE THE DISASSEMBLY PROCEDURE
 INSTRUCTIONS IN THE O & M MANUAL THAT THE
 CONTRACTOR/DESIGN TEAM WILL PROVIDED TO RESTORATION
 HARDWARE.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  