| 2016-08-24 12:00:54 | #1 NOTE PLANS THAT UTILITIES SHOWN WILL NOT BE |
| | INSTALLED AS PART OF THE FOUNDATION PERMIT. |
| | |
| | #2 NOTE: CALL 811 BEFORE DIG (CITY OF WEST PALM BEACH |
| | PUBLIC UTILITIES USED TO RUN THRU SITE) |
| | CONTACT DISPATCH (561) 822-2222 SHOULD YOU ENCOUNTER |
| | LIVE CITY OF WPB UTILITIES. |
| | (CAPPING, TEMPORARY SERVICES AND RELOCATIONS SHALL BE |
| | PERFORMED AT DEVELOPERS EXPENSE WITH CITY OF WPB |
| | PUBLIC UTILITY SUPERVISION) |
| | |
| | #3 NOTE: INFORMATION SHOWN ON THE DRAWINGS AS TO THE |
| | LOCATION OF EXISTING UTILITIES HAS BEEN PREPARED |
| | FROM THE MOST RELIABLE DATA AVAILABLE TO THE ENGINEER. |
| | THIS INFORMATION IS NOT GURANTEED, HOWEVER, |
| | AND IT SHALL BE THE CONTRACTOR'S RESPONSABILITY TO |
| | DETERMINE THE LOCATION, CHARACTER AND DEPTH OF EXISTING |
| | UTILITIES. |
| | |
| | #4 ENGINEERING SERVICES EROSION CONTROL & LAND |
| | STABILIZATION BOND (ORD. 4060-07) REQUIRED. |
| | BASEND ON ENGINEER'S COST ESTIMATE TO RESTORE SITE TO |
| | SURFACE, GRASSED, EQUAL OR BETTER CONDITION! |
| | SEE LINK BELOW: PERFORMANCE BOND ? PUBLIC IMPROVEMENTS |
| | HTTP://WPBFL.US/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FO |
| | RMS,-PERMITS-APPLICATIONS |
| | |
| | MANUEL JULIAN GONZALEZ |
| | ENGINEERING PROJECT COORDINATOR |
| | PUBLIC WORKS DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 |
| | DIRECT: (561) 494-1085 |
| | FAX: (561) 494-1116 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |
| | |
| | |