| 2016-06-21 11:28:07 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | 1) SHEET A 1.01 - NO DOOR SCHEDULE IS INDICATED. THREE |
| | (3) DOORS ARE NOT SPECIFICALLY INDICATED; THE WAREHOUSE |
| | STORAGE / CORRIFOR DOOR, THE OPEN OFFICE / CORRIDOR |
| | DOOR AND THE COMMON LOBBY / CORRIDOR DOOR. |
| | |
| | PLEASE PROVIDE APPLICABLE DOOR SCHEDULE INFORMATION, |
| | INCLUDING HARDWARE, AND DIMENSIONS. |
| | |
| | |
| | 2) SHEET A.1.01 - THERE IS AN INDICATION OF AN EMEGENCY |
| | LIGHT IN OFFICE # 3. IT IS RECOMMENDED TO MOVE THAT |
| | EMEGENCY LIGHT INTO THE EXIT CORRIDOR. |
| | |
| | |
| | 3) SHEET A 1.00 - THERE IS AN INDICATION THAT THE |
| | BUILDING IS FULLY SPRINKLERED. |
| | |
| | PLEASE PROVIDE A NOTE THAT ANY AND ALL WORK ON THE FIRE |
| | SPRINKLER SYSTEM SHALL BE DONE UNDER SEPARATE SHOP |
| | DRAWINGS BY CERTIFIED LIFE SAFETY CONTRACTORS. |
| | |
| | 4) SHEET E 1.01 - THERE ARE NO INDICATIONS OF ANY FIRE |
| | ALARM DEVICES. |
| | |
| | PLEASE VERIFY AND PROVIDE A NOTE SAYING NO FIRE A,ARM |
| | DEVICES; HOWEVER, IF THEY ARE EXISTING PROVIDE |
| | LOCATIONS. |
| | |
| | ADDITIONALLY, PLEASE PROVIDE A NOTE THAT ANY AND ALL |
| | WORK ON THE FIRE ALARM SYSTEM SHALL BE DONE UNDER |
| | SEPARATE SHOP DRAWINGS BY CERTIFIED LIFE SAFETY |
| | CONTRACTORS. |
| | |
| | 5) SHEET M 1.01 - THERE IS NO INDICATION OF THE SIXE OF |
| | THE A/C SYSTEM. |
| | |
| | DUCT DETECTORS |
| | PER NFPA 90 A , CHAPTER 6 CONTROLS |
| | 6.4* SMOKE DETECTION FOR AUTOMATIC CONTROL. |
| | 6.4.1 TESTING. ALL AUTOMATIC SHUTDOWN DEVICES SHALL BE |
| | TESTED AT LEAST ANNUALLY. |
| | 6.4.2* LOCATION. |
| | 6.4.2.1 SMOKE DETECTORS LISTED FOR USE IN AIR |
| | DISTRIBUTION SYSTEMS SHALL BE LOCATED AS FOLLOWS: |
| | (1) DOWNSTREAM OF THE AIR FILTERS AND AHEAD OF ANY |
| | BRANCH CONNECTIONS IN AIR SUPPLY SYSTEMS HAVING A |
| | CAPACITY GREATER THAN 944 L/SEC (2000 FT3/MIN) |
| | (2) AT EACH STORY PRIOR TO THE CONNECTION TO A COMMON |
| | RETURN AND PRIOR TO ANY RECIRCULATION OR FRESH AIR |
| | INLET CONNECTION IN AIR RETURN SYSTEMS HAVING A |
| | CAPACITY GREATER THAN 7080 L/SEC (15,000 FT3/MIN) AND |
| | SERVING MORE THAN ONE STORY |
| | |
| | |
| | 6) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |
| | |