2016-08-01 13:41:43PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE TYPE OF CONSTRUCTION IS SPECIFIED AS III B ON
 PLAN SHEETS CVR AND SP-1. THIS STRUCTURE DOES NOT MEET
 THE REQUIREMENTS OF TYPE III B CONSTRUCTION. TYPE III B
 CONSTRUCTION REQUIRES THE EXTERIOR WALLS INCLUDING
 GABLE END WALLS TO BE CONSTRUCTED OF NON COMBUSTIBLE
 MATERIALS AND HAVE A MINIMUM 2 HOUR FIRE RATING, AS
 WELL AS, OTHER REQUIREMENTS. THE TYPE OF CONSTRUCTION
 FOR SINGLE FAMILY HOMES LIKE THIS ONE ARE TYPICALLY V
 B. PLEASE CORRECT. SEE FBC 602.1
  
 2) THE WINDOW SAFE GUARD NOTES ON SHEETS A-0 AND A-2
 SPECIFY A DROP OF 4 FEET (48") TO THE GROUND OR
 EXTERIOR SURFACE BELOW. THE DISTANCE IS 6 FEET (72") IN
 FBCR SECTION R312.2.1 WINDOW SILLS.
 IN DWELLING UNITS, WHERE THE OPENING OF AN OPERABLE
 WINDOW IS LOCATED MORE THAN 72 INCHES (1829 MM) ABOVE
 THE FINISHED GRADE OR SURFACE BELOW, THE LOWEST PART OF
 THE CLEAR OPENING OF THE WINDOW SHALL BE A MINIMUM OF
 24 INCHES (610 MM) ABOVE THE FININSHED FLOOR OF THE
 ROOM IN WHICH THE WINDOW IS LOCATED. OPERABLE SECTIONS
 OF WINDOWS SHALL NOT PERMIT OPENINGS THAT ALLOW PASSAGE
 OF A 4-INCH-DIAMETER (102 MM) SPHERE WHERE SUCH
 OPENINGS ARE LOCATED WITHIN 24 INCHES (610 MM) OF THE
 FINISHED FLOOR. PLEASE REVISE.
  
 3) THE WRONG EDITIONS OF THE STANDARDS ARE SPECIFIED IN
 THE STRUCTURAL NOTES ON SHEET A-O. THE 2014 FBCR
 REFERENCES THE 2011 EDITION. SEE FBCR CHAPTER 46. THE
 CORRECT EDITIONS ARE ACI 530-11, ACI 530.1-11, ASCE
 5-11, TMS-11, ASCE 6-11 AND TMS602-11.
  
 4) ON SHEET A-1, WINDOW NOTE #2 REFERENCES THE 2010
 FBC. PLEASE UPDATE TO THE 2014 FBC.
  
 5) NOTE #6 ON SHEET A-1 SPECIFIES THAT ALL GLAZED
 OPENINGS ARE TO RECEIVE ACCORDION SHUTTERS. PLEASE
 CLARIFY. FBC 107.2.1
  
 6) REVISE WALL SECTION 9 ON SHEET A-2 TO SHOW THAT THE
 INSULATION IS CONTINOUS FROM THE WALL TO THE ROOF
 INSULATION WITH NO GAP.
  
 7) SUBMIT THE MANUFACTURER'S SPECIFICATIONS AND THE
 EVALUATION REPORT FOR THE SPRAY FOAM INSULATION. FBCR
 316
  
 8) SHOW COMPLIANCE WITH 2014 FBC ENERGY CONSERVATION
 SECT. 101.5.1 & 103.1 BY SUBMITTING (2) SETS OF THE
 PROPER CONSTRUCTION DOCUMENTS. SEE RESIDENTIAL BUILDING
 FORMS 402 OR 405.
  
 9) WINDOW B IS NOT SPECIFIED IN THE WINDOWS SCHEDULE ON
 SHEET A-1. FBC 107.2.1
  
 10) ON SHEET A-5 THE LOAD SCHEDULE NOTE REFERENCES THE
 2012 FBC. PLEASE UPDATE TO THE 2014 FBC.
  
 11) THE ROOF SHEATHING FASTENING NOTE ON SHEET A-5
 SPECIFIES 8D COMMON NAILS AND DETAIL 3 ON A-5 HAS 10D
 NAILS. FBCR 803.2.3.1 REQUIRES 8D RING SHANK NAILS.
 PLEASE COORDINATE THE INFORMATION ON THE PLANS.
  
 12) PROVIDE AN ENGINEER'S ANALYSIS WITH CALCULATIONS OF
 THE CONCRETE BEAM MODIFICATIONS AT THE OPENING FROM THE
 KITCHEN TO THE ADDITION. FBC 107.2..2.1.3
  
 13) THERE APPEARS TO BE SOME INCONSISTANCIES IN THE
 STEEL BUCKET DETAIL (5) ON SHEET A-5. PLEASE REVIEW AND
 PROVIDE MORE DETAILS AND DIMENSIONS FOR THE HANGER. FBC
 107.2..2.1.3
  
 14) FBC 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS
 FOR THOSE PRODUCTS WHICH ARE REGULATED BY DCA RULE 9N-3
 THAT HAVE BEEN REVIEWED AND APPROVED IN WRITING BY THE
 DESIGNER OF RECORD. PROVIDE TWO COMPLETE PRODUCT
 APPROVALS WITH FL OR NOA NUMBERS INCLUDING INSTALLATION
 INSTRUCTIONS AND MAXIMUM DESIGN PRESSURES FOR THE ROOF
 SHINGLES, WINDOWS/GLASS TYPES, ACCORDION SHUTTERS AND
 EXTERIOR DOORS.
  
 15) IN ADDITION TO THE PRODUCT APPROVALS FOR THE IMPACT
 PROTECTION DEVICES ( ACCORDION SHUTTERS ), SUBMIT TWO
 COPIES OF A KEY PLAN AND AN INSTALLATION SCHEDULE. FBC
 - R 301.2.1.2 SUBMIT TWO COPIES OF AN INSTALLATION
 SCHEDULE AND KEY PLAN FOR THE STORM PANELS. SPECIFY THE
 OPENING SIZE, THE WIND PRESSURES, TYPE OF ANCHOR,
 ANCHOR SPACING, EDGE DISTANCE, PANEL LENGTH, PANEL
 SPAN, SEPARATION DISTANCE FROM PANEL TO GLASS AND THE
 APPLICABLE SECTION NUMBER FROM THE INSTALLATION
 DRAWINGS. I HAVE INCLUDED A LINK TO THE CONSTRUCTION
 SERVICES DEPARTMENT SITE THAT HAS MANY OF THE RELATED
 FORMS INCLUDING THE SCHEDULE FOR INSTALLATION OF
 OPENING PROTECTIVE DEVICES.
 HTTP://WPB.ORG/DEVELOPMENT/FORMS-AND-PUBLICATIONS/
  
 16) IN ORDER TO REDUCE PLAN REVIEW TIME, PLEASE SUBMIT
 A RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW
 COMMENTS HAS BEEN ADDRESSED.
  
  
  
  
  
  
  