| Plan Review Notes For Permit 16060181 |
| Permit Number |
16060181 |
|
| Review Stop |
M |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2016-08-03 16:25:27 | 2ND REVIEW: FBC 2014 MECHANICAL | | | PERMIT #16060181 | | | 8/3/16 | | | | | | COMMENTS #1-4 FROM THE 1ST REVIEW STILL EXIST. I HAVE | | | REPRINTED THEM BELOW WITH SOME MODIFICATIONS BASED ON | | | THIS 2ND REVIEW. | | | | | | 1) COMMISSIONING OF THE AC SYSTEMS IS REQUIRED IN | | | ACCORDANCE WITH SECTION C408.2 FBC-14 ENERGY | | | CONSERVATION. SUBMIT A COMMISSIONING PLAN IN COMPLIANCE | | | WITH C408.2.1 FBC-14 ENERGY CONSERVATION. | | | | | | 2) THE COMPLIANCE DATA FOR THE AC SYSTEMS (AC | | | IDENTIFICATIONS, AND CAPACITIES) LISTED ON PAGE 6 OF | | | THE ENERGY GAUGE PERFORMANCE SUBMITTAL DO NOT MATCH THE | | | SCHEDULES ON SHEET M8. | | | | | | 3) ENERGY GAUGE SUBMITTAL, PAGE 2 CERTIFICATIONS: THE | | | ARCHITECT OF RECORD MUST PROVIDE HIS REGISTRATION | | | NUMBER ON THE PAGE. | | | | | | 4) REFER TO SECTION C403.2.2 FBC-14 ENERGY | | | CONSERVATION: THE CAPACITIES OF THE DAIKIN AC SYSTEMS | | | SPECIFIED FOR THE 1ST- 4TH FLOOR WAREHOUSE AREAS ARE | | | EXCEEDING THE CALCULATED LOADS SHOWN IN THE SIZING | | | SUMMARRIES. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|