| 2016-06-16 10:38:45 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #16060181 |
| | 6/16/16 |
| | |
| | 1) COMMISSIONING OF THE AC SYSTEMS IS REQUIRED IN |
| | ACCORDANCE WITH SECTION C408.2 FBC-14 ENERGY |
| | CONSERVATION. SUBMIT A COMMISSIONING PLAN IN COMPLIANCE |
| | WITH C408.2.1 FBC-14 ENERGY CONSERVATION. |
| | |
| | 2) THE COMPLIANCE DATA FOR THE AC SYSTEMS (AC |
| | IDENTIFICATIONS, AND CAPACITIES) LISTED ON PAGE 6 OF |
| | THE ENERGY GAUGE PERFORMANCE SUBMITTAL DO NOT MATCH THE |
| | SCHEDULES ON SHEET M8. |
| | |
| | 3) ENERGY GAUGE SUBMITTAL, PAGE 2 CERTIFICATIONS: THE |
| | ARCHITECT OF RECORD MUST PROVIDE HIS SIGNATURE, SEAL, |
| | AND REGISTRATION NUMBER ON THE PAGE. THE OWNER MUST |
| | SIGN AND DATE. |
| | |
| | 4) REFER TO SECTION C403.2.2 FBC-14 ENERGY |
| | CONSERVATION: THE CAPACITIES OF THE DAIKIN AC SYSTEMS |
| | ARE EXCEEDING THE CALCULATED LOADS SHOWN IN THE SIZING |
| | SUMMARRIES. |
| | |
| | 5) SHEETS A-6.1- A-6.5: PROVIDE CEILING FINISH SYMBOLS |
| | IN THE LEGENDS. PLEASE NOTE THAT ACCESS FOR MAINTENANCE |
| | AND REPLACEMENT OF ABOVE CEILING AIR HANDLERS MUST BE |
| | PROVIDED PER SECTION 306.1. INDICATE REQUIRED ACDCESS |
| | PANELS ON THE PLANS WITH DIMENSIONS. |
| | |
| | 6) M1- M5: DUCT SMOKE DETECTORS ARE REQUIRED IN THE |
| | RETURN AIR SYSTEMS OF THE AHU'S- SEE SECTION 606.2.1. |
| | REVISE THE PLAN TO SHOW THE LOCATIONS AND PROVIDE |
| | INSTALLATION DETAILS. |
| | |
| | 7) M1- M5: PROVIDE CLEARANCE DISTANCE MEASUREMENTS FOR |
| | THE OUTDOOR AIR INTAKES AS REQUIRED BY SECTION 401.4. |
| | |
| | 8) M1- M5: PROVIDE EQUIPMENT SCHEDULES AND SUBMITTALS |
| | (FL. PRODUCT APPROVALS AND/OR NOA'S) FOR THE EXHAUST |
| | OUTLET AND O/A INTAKE WALL CAPS- REFER TO SECTIONS |
| | 401.5 AND 501.3.2. |
| | |
| | 9) M7: THE AC MOUNTING DETAIL NEEDS TO BE CLARIFIED |
| | (MUCH OF THE PRINT IS ILLEGIBLE). PROVIDE A FL. PRODUCT |
| | APPROVAL AND/OR MIAMI-DADE NOA FOR THE STAND, AND |
| | PROVIDE THE WIND LOAD DESIGN CRITERIA PER SECTION 1609 |
| | FBC-14 BUILDING. |
| | |
| | 10) P1: PROVIDE A CONDENSATE DISPOSAL PLAN FOR AHU-1.F |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |