| Plan Review Notes For Permit 16051310 |
| Permit Number |
16051310 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-06-02 16:58:46 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. A RENOVATION PERMIT HAS NOT BEEN SUBMITTED FOR THIS | | | UNIT. PER THE BUILDING OFFICIAL (AND ASSISTANT BUILDING | | | OFFICIAL AND CHIEF PLANS EXAMINER), A DEMOLITION PERMIT | | | TO GUT A UNIT WILL NOT BE ISSUED WITHOUT A RENOVATION | | | PERMIT SUBMITTED. THIS WOULD CREATE A NON COMPLIANCE | | | WHICH WOULD EXIST FOR SEVERAL MONTHS (TIME FOR DESIGN, | | | TIME FOR PLAN REVIEW). APPLICATION STATES THAT | | | DEMOLITION IS REQUIRED SO THE ARCHITECT AND ENGIEER CAN | | | DRAW TENANT IMPROVEMENT PLANS. IT IS NOT CLEAR WHY | | | DEMOLITION WOULD BE NECESSARY AS ALL INTERIOR ELEMENTS | | | ARE PROPOSED TO BE REMOVED. IF STRUCTURAL INTEGRITY IS | | | IN QUESTION, A SELECTIVE DEMO PERMIT WOULD BE | | | CONSIDERED. IF A SELECTIVE DEMOLITION PERMIT IS | | | REQUESTED, PROVIDE JUSTIFICATION (PHOTOGRAPHS, LETTER, | | | ETC.) TO DEMONSTRATE WHY IT IS NOT POSSIBLE FOR AN | | | ARCHITECT AND ENGINEER TO DESIGN THE SPACE WITHOUT THE | | | INFORMATION WHICH A SELECTIVE DEMOLITION PERMIT WOULD | | | REVEAL. | | | | | | 2. AN ELECTRICAL PERMIT APPLICATION IS REQUIRED PRIOR | | | TO ISSUANCE OF INTERIOR DEMOLITION PERMITS, FBC 107. | | | | | | | | | | | | | | | | | | |
|