| 2016-06-02 08:05:48 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #16051290 |
| | 6/1/16 |
| | |
| | 1) PROVIDE ENERGY CALCULATIONS IN COMPLIANCE WITH |
| | SECTIONS C101.4.4 AND C401.2 FBC-14 ENERGY |
| | CONSERVATION. |
| | |
| | 2) PROVIDE AC CALCULATIONS FOR THE MINI-SPLITS AND THE |
| | SCOP RATING OF AC-5 I N THE IT ROOM- SEE TABLE |
| | C403.2.3(10). |
| | |
| | 3) IT DOES NOT APPEAR THAT ADEQUATE HEATING IS BEING |
| | SUPPLIED TO ALL ROOMS AND SPACES BASED ON THE AC |
| | CALCULATIONS, AND THE EQUIPMENT SCHEDULES. PLEASE |
| | CLARIFY WHY MANY OF THE WT BOXES ARE NOT EQUIIPPED WITH |
| | HEAT- REFER TO SECTION 309.1 FBC-14 MECHANICAL. |
| | |
| | 4) TYPE II HEAT HOODS ARE REQUIRED FOR THE CONVECTION |
| | OVENS IN THE CAFE- SEE SECTION 507.2.2 AND REVISE THE |
| | PLAN ACCORDINGLY. SEE ALSO TABLE 6-4 ASHRAE 62.1- 2010 |
| | WHICH REQUIRES AN EXHAUST RATE OF 0.30 CFMS PER SF. |
| | FPOR KITCHENETTES. |
| | |
| | 5) THE EXHAUST DUCT FROM THE JANITOR'S CLOSET SHALL NOT |
| | CONNECT INTO THE MAIN DUCT SERVING THE RESTROOMS- |
| | SECTION 501.2 |
| | |
| | 6) THE RESTOOM EXHAUST FANS MUST HAVE A MINIMUM |
| | CAPACITY OF 140 CFMS EACH IN ACCORDANCE WITH TABLE |
| | 403.3. |
| | |
| | 7) PROVIDE AN EXHAUST VENTILATION CALCULATION FOR THE |
| | MULTI- FUNCTION ROOM, AND CLARIFY THE NEED FOR THE |
| | EXHAUST SYSTEM IN THE ROOM (WHAT WORK IS BEING |
| | CONDUCTED IN THE ROOM THAT REQUIRES EXHAUST?). SHOW THE |
| | EXHAUST DUCT RUN AND TERMINATION LOCATION. |
| | |
| | 8) PROVIDE ENGINEERED DETAILS FOR MOUNTING THE OACU-1 |
| | CURB TO THE ROOF STRUCTURE AND THE UNIT TO THE CURB- |
| | SECTION 301.15. SUBMIT TWO COPIES OF THE MIAMI-DADE NOA |
| | FOR THE CONDENSER STANDS APPROVED WITH SIGNATURE BY THE |
| | STRUCTURAL EOR. |
| | |
| | 9) PROVIDE BPD AND WT BOX INSTALLATION DETAILS. |
| | |
| | 10) PROVIDE SPECIFICATIONS FOR THE CHILLED WATER PIPING |
| | AND PIPE INSULATION. |
| | |
| | 11) SHEET M2.1: FLEX DUCT SIZES NOT SHOWN ON THE PLAN. |
| | A) PROVIDE A FIRE DAMPER FOR THE EXHAUST DUCT |
| | PENETRATING THE CORRIDOR WALL- SECTION 607.5.2. |
| | |
| | 12) M7.2: PROVIDE A DUCT SMOKE DETECTOR IN THE RETURN |
| | AIR DUCT SHOWN IN THE CARRIER CONTROLS DIAGRAM- SECTION |
| | 606.2.1. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |