| 2016-06-10 07:45:44 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT 16051235 |
| | 6/10/16 |
| | |
| | 1) AN AC SYSTEM, EXHAUST FAN, AND MOTORIZED LOUVER ARE |
| | SHOWN ON SHEET D-01-01- THE CHEMICAL FEED SHELTER |
| | BUILDING: PLEASE PROVIDE MECHANICAL PLANS INCLUDING: |
| | A) AC SYSTEM, EXHAUST FAN, AND LOUVER EQUIPMENT |
| | SCHEDULES |
| | B) AC LOAD CALCULATIONS |
| | C) EXHAUST VENTILATION CALCULATIONS |
| | D) SEQUENCE OF OPERATIONS FOR THE AC, FAN, AND LOUVER |
| | E) WIIND LOAD ENGINEERING FOR INSTALLATION OF THE FAN |
| | AND LOUVER. |
| | |
| | 2) PROVIDE CLEARANCE DISTANCE MEASUREMENTS FOR THE AIR |
| | INTAKE LOUVER AS REQUIRED BY SECTION 401.4, AND INTAKE |
| | OPENING PROTECTION DETAILS PER 401.5. SUBMIT A FL. |
| | PRODUCT APPROVAL OR MIAMI-DADE NOA FOR THE LOUVER WITH |
| | APPROVAL SIGNATURE BY THE DESIGN PROFESSIONAL OF |
| | RECORD. |
| | |
| | 3) PROVIDE CLEARANCE DISTANCE MEASUREMENTS FOR THE FAN |
| | DISCHARGE AS REQUIRED BY SECTION 501.3.1, AND OPENING |
| | PROTECTION DETAILS PER 501.3.2. SUBMIT A FL. PRODUCT |
| | APPROVAL OR MIAMI-DADE NOA FOR THE FAN WITH APPROVAL |
| | SIGNATURE BY THE DESIGN PROFESSIONAL OF RECORD. |
| | |
| | 4) PLEASE REFER TO SECTION 414.1.3 FBC-14 BUILDING AND |
| | SUBMIT THE REQUIRED REPORT FOR THE SODIUM HYPOCHLORITE |
| | AND ALL OTHER CHEMICALS TO BE STORED ON USED FOR |
| | PROCESSING IN THE BUILDING. PLEASE NOTE THAT A |
| | HAZARDOUS EXHAUST VENTILATION SYSTEM MAY BE REQUIRED- |
| | SEE SECTION 510 FBC-14 MECHANICAL FOR CODE |
| | REQUIREMENTS. |
| | |
| | 5) PROVIDE SUBMITTALS FOR ALL PROCESS PIPING, VALVES, |
| | AND FITTINGS WITH SHOP DRAWING APPROVAL SIGNATURES FROM |
| | THE DESIGN PROFESSIONAL OF RECORD. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |