| 2016-10-15 08:51:16 | 1) SHT. P5.1 - SHOW THE TYPE OF PIPE MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, SIZE THE BRANCH LINES FOR |
| | GWH-2 & GWH-3. WPB AMENDMENTS TO FBC SEC.107.2.1. |
| | |
| | 2) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| | FROM THE TANK TO THE STEP DOWN REGULATOR AND FROM THE |
| | STEP DOWN REGULATOR TO THE APPLIANCES. ON THE PLAN PER |
| | 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. SEC. G2413.2. |
| | . 2ND REQUEST. |
| | |
| | 3) SUBMIT CALCULATIONS FOR COMBUSTION AIR FOR THE DRYER |
| | PER 2014 FGC SEC.304.1. 2ND REQUEST. WHAT HAS BEEN |
| | SUBMITTED IS NON-COMPLIANT AND IS NOT A CALCULATION FOR |
| | COMBUSTION AIR.THE NOTE AT THE BOTTOM OF THE COMBUSTION |
| | AIR CALCULATION REFERS TO THE 2010/2009 FLORIDA |
| | BUILDING CODE. THE CODE IN EFFECT IS THE 2014 CODE. |
| | |
| | 4) GAS APPLIANNCES SHALL BE LISTED AND LABELED. THE |
| | INSTALLATION MANUALS FOR ALL GAS APPLIANCES / EQUIPMENT |
| | SHALL BE ONSITE AT THE TIME OF INSPECTION. FGC |
| | SEC.305.1. THIS IS FOR INFORMATION ONLY. |
| | |
| | 5) SHT. C4.01 SHOWS A 1 1/2 INCH GAS LINE AND SHT. P5.1 |
| | SHOWS 2 INCH. CLARIFY. 2ND REQUEST. |
| | |
| | 6) THE GAS SIZING TABLE REFERENCED ON THE GAS RISER IS |
| | FOR NATURAL GAS AND THIS SYSTEM IS PROPANE THEREFORE A |
| | COMPRHENSIVE GAS REVIEW COULD NOT BE DONE. PLACE A |
| | REFERENCE ON THE PLAN TO THE CORRECT SIZING TABLE USED |
| | FOR THIS SYSTEM. |
| | |
| | 7) THE GAS RISER SHOWS THE DRYER AS HAVING 35,000 BTU'S |
| | AND SHT. P0.1 SHOWS 110,000 BTU'S. CLARIFY. |
| | |
| | 7) EMERGENCY HOOD SHUT DOWN SHUT OFF VALVE SHALL BE |
| | BELOW THE CEILING. THE MANUAL SHUTOFF VALVE SHALL BE |
| | UPSTREAM. UNION TO BE DOWN STREAM OF MANUAL VALVE. SHOW |
| | THIS ON THE GAS RISER. WPB AMEND. TO FBC SEC. 107.2.1. |
| | |
| | 8) CLEARLY SHOW THE CAPACITY OF THE LP TANK, TYPE OF |
| | TANK ( DOT OR ASME ), THE DISTANCE OF THE TANK FROM ALL |
| | SOURCES OF IGNITION, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE TANK. COMPLY |
| | WITH NFPA 58, TABLE 6.3.1, TABLE 6.3.8, & SECS. 6.3.8 & |
| | 6.3..9. |
| | |
| | 9) CLEARLY SHOW THE METHOD OF REQUIRED PROTECTION FOR |
| | THE ABOVEGROUND LP TANK AND APPURTENANCES PER NFPA 58. |
| | WIND LOAD ANCHORING DETAILS FOR LP TANK BY ENGINEER OF |
| | RECORD SHALL BE SUBMITTED AT TIME OF LP GAS PERMIT |
| | APPLICATION. |
| | |
| | 10) SHT. P5.1 - THE GAS RISER SHOWS THE PRESSURE |
| | REDUCING FROM 2 PSI TO 0.5 PSI WITHOUT ANY STEP DOWN |
| | REGULATORS ON THE SYSTEM. SHOW THE LOCATION OF ALL |
| | STEP-DOWN REGULATORS ON THE RISER. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |