| 2017-03-09 16:14:06 | MECHANICAL PROVISOS. |
| | NORTON MUSEUM OF ART |
| | PERMIT #16050912 |
| | 3/9/2017 |
| | |
| | 1) THE MECHANICAL PLANS HAVE BEEN APPROVED |
| | CONDITIONALLY. A REVISION TO THE PLANS IS REQUIRED TO |
| | CORRECT THE DEFICIENCIES LISTED BELOW. |
| | |
| | A) PROVIDE DUCT SMOKE DETECTORS IN THE RETURN SYSTEMS |
| | OF THE AHU'S. |
| | |
| | B) PROVIDE FIRE DAMPERS FOR ALL DUCTS PENETRATING THE |
| | FIRE-RATED WALL OF MECHANICAL ROOM 302. |
| | |
| | C) A NEW CHILLER (CH-1) IS BEING INSTALLED IN THE |
| | EXISTING MECHANICAL ROOM. ADDITIONAL VENTILATION FOR |
| | NORMAL AND EMERGENCY VENTILATION MAY BE REQUIRED. REFER |
| | TO SECTIONS 1105.6- 1105.6.3.2 FBC-14 MECHANICAL AND |
| | PROVIDE EXHAUST VENTILATION CALCULATIONS FOR BOTH |
| | NORMAL AND EMERGENCY CONDITIONS AS REQUIRED BY SECTIONS |
| | 1105.6.3.1 AND 1105.6.3.2. SHOW LOCATIONS OF ALL |
| | COMPONENTS OF THE VENTILATION SYSTEM INCLUDING EXHAUST |
| | FANS AND AIR INTAKES. INCLUDE EQUIPMENT SCHEDULES FOR |
| | ALL EXISTING FANS OR NEW FANS (EXHAUST OR INTAKE) |
| | INDICATING THEIR CAPACITIES, AND THE DIMENSIONS OF ALL |
| | AIR INTAKE OPENINGS. PLEASE NOTE THE NEW CH-3 USES A |
| | DIFFERENT REFRIGERANT THAN THE EXISTING CH-1 AND CH-2, |
| | THEREFORE THE EXISTING LEAK DETECTOR MAY NOT BE |
| | COMPATIBLE. |
| | SUBMIT SPECIFICATIONS FOR THE LEAK DETECTOR. |
| | |
| | D) AHU HEATING COIL: CORRECT OR CLARIFY THE CONFLICTS |
| | BETWEEN THE AC CALCULATIONS FOR THE HEATING COIL |
| | SELECTION VERSUS THE HEATING CAPACITIES SHOWN IN THE |
| | EQUIPMENT SCHEDULES: AHU'S 3, 14, 18, 19, 20, & 22. |
| | |
| | 2) DEFERRED SUBMITTALS: AS REQUESTED BY THE CONTRACTOR |
| | PLEASE REVIEW THE FOLLOWING LIST OF DEFERRED |
| | SUBMITTALS. PLEASE NOTE:) DEFERRED SUBMITTALS SECTION |
| | 107.3.4.2 WPB AMENDMENTS TO THE FBC. FOR THE PURPOSES |
| | OF THIS SECTION, DEFERRED SUBMITTALS ARE DEFINED AS |
| | THOSE PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT |
| | THE TIME OF THE APPLICATION AND THAT ARE TO BE |
| | SUBMITTED TO THE BUILDING OFFICIAL WITHIN A SPECIFIED |
| | PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE |
| | PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| | FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |
| | A) STRUCTURAL ENGINEERING FOR INSTALLATION OF THE |
| | COOLING TOWERS INCLUDING THE SUPPORT BASE, ACCESS |
| | STAIRS, WALKWAYS AND PLATFORM. |
| | |
| | B) MECHANICAL AND ELECTRICAL POWER AND LIGHTING SYSTEMS |
| | COMMISSIONING: PRELIMINARY AND FINAL REPORTS. |
| | |
| | C) FLORIDA PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S |
| | FOR LOUVERS PROTECTING OUTSIDE AIR AND EXHAUST OUTLET |
| | OPENINGS. PLEASE NOTE:) PRODUCT APPROVALS- THOSE |
| | PRODUCTS WHICH ARE REGULATED BY THE DCA RULE 9N-03 |
| | SHALL BE REVIEWED AND APPROVED IN WRITING BY THE |
| | DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR |
| | JURISDICTIONAL APPROVAL. |
| | |
| | D) MANUFACTURER'S SPECIFICATIONS FOR THE GLOBAL PLASMA |
| | SOLUTIONS IAQ EQUIPMENT AND DEVICES. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |