| 2016-10-26 08:23:33 | 2ND REVIEW FBC-2014 MECHANICAL |
| | PERMIT #16050912 |
| | NORTON MUSEUM OF ART |
| | 10/25/16 |
| | |
| | THE SECOND REVIEW OF THE RESUBMITTED PLANS AND |
| | DOCUMENTS INDICATE THAT MANY OF THE 1ST REVIEW COMMENTS |
| | STILL EXIST EITHER ENTIRELY OR PARTIALLY. THOSE |
| | COMMENTS AND THE DESIGN PROFESSIONAL'S NARRATIVE |
| | RESPONSES WILL BE REFERENCED IN THIS FOLLOW-UP REVIEW |
| | |
| | 1) COMMENT #1 FROM THE 1ST REVIEW: AS REQUESTED BY THE |
| | ENGINEER IN THE NARRATIVE, THE COMMISSIONING OF THE |
| | BUILDING MECHANICAL AND ELECTRICAL POWER AND LIGHTING |
| | SYSTEMS IS ACCEPTABLE AS A DEFERRED SUBMITTAL, HOWEVER |
| | AN OUTLINE OF THE PROCEDURES MUST BE PLACED ON THE |
| | MECHANICAL AND ELECTRICAL PLANS. |
| | |
| | 2) COMMENT #2, 1ST REVIEW: THE REQUESTED AC COOLING AND |
| | HEATING CALCULATIONS WERE NOT SUBMITTED- PLEASE |
| | PROVIDE. |
| | |
| | 3) COMMENT #3: THE ENERGYGAUGE COMPLIANCE SUBMITTAL |
| | MUST BE SIGNED BY THE OWNER/AGENT. |
| | |
| | 4) COMMENT #4: PLEASE REFER TO SECTION 6.3.6 ASHRAE |
| | 62.1- 2010 AND SUBMIT DOCUMENTATION TO CLARIFY THE IAQ |
| | PROCEDURE. |
| | |
| | 6.3.6 DOCUMENTATION. WHEN THE IAQ PROCEDURE IS USED, |
| | THE FOLLOWING INFORMATION SHALL BE INCLUDED IN THE |
| | DESIGN DOCUMENTATION: |
| | THE CONTAMINANTS OF CONCERN CONSIDERED IN THE |
| | DESIGN PROCESS, THE SOURCES AND EMISSION RATES OF THE |
| | CONTAMINANTS |
| | OF CONCERN, THE CONCENTRATION LIMITS AND EXPOSURE |
| | PERIODS |
| | AND THE REFERENCES FOR THESE LIMITS, AND THE ANALYTICAL |
| | APPROACH USED TO DETERMINE VENTILATION RATES AND AIR |
| | CLEANING |
| | REQUIREMENTS. THE CONTAMINANT MONITORING AND OCCUPANT |
| | AND/ |
| | OR VISITOR EVALUATION PLANS SHALL ALSO BE INCLUDED IN |
| | THE DOCUMENTATION. |
| | |
| | 5) COMMENTS #5 & 6: DEFERRED SUBMITTALS FOR THE O/A |
| | LOUVERS ARE ACCEPTABLE PER THE NARRATIVE REQUEST, |
| | HOWEVER THE LOCATIONS AND CLEARANCES FOR THE AIR |
| | INTAKES MOST BE SHOWN ON THE PLANS. |
| | |
| | 6) COMMENT #7: THE NARRATIVE REFERENCES SHEET M-604 IN |
| | RESPONSE TO THE COMMENT, HOWEVER THAT PLAN SHEET HAS |
| | NOT BEEN UPLOADED FOR REVIEW. |
| | |
| | 7) COMMENT #8: THE REQUESTED EXHAUST VENTILATION |
| | CALCULATIONS FOR THE CHILLER ROOM AND FAN SCHEDULE WERE |
| | NOT PROVIDED- SEE SECTIONS 1105.6.3.1 AND 1105.6.3.2 |
| | AND INDICATE COMPLIANCE. |
| | |
| | 8) COMMENT #10: THE NARRATIVE RESPONSE SUBMITTED TO |
| | THIS COMMENT STATES THAT THE ANCHORAGE OF THE COOLING |
| | TOWERS WILL BE ENGINEERED AND INSTALLED BY THE |
| | CONTRACTOR. PLEASE NOTE THAT THE STRUCTURAL PLANS AND |
| | DETAILS FOR INSTALLATION OF THE COOLING TOWERS |
| | INCLUDING THE SUPPORT BASES AND ATTACHMENTS SHALL BE |
| | DESIGNED BY A FL. LICENSED ENGINEER IN ACCORDANCE WITH |
| | FLORIDA STATUTE 471. PLEASE PROVIDE THE REQUESTED |
| | ENGINEERING AND SUBMITTAL DOCUMENTS. |
| | |
| | 9) COMMENT #12: PLEASE CORRECT THE ENERGY SUBMITTAL |
| | WHICH INDICATES 1 CHILLER INSTEAD OF THE 3 BEING |
| | INSTALLED, AND SUBMIT MANUFACTURER'S SPECIFICATIONS AS |
| | PREVIOUSLY REQUESTED. |
| | |
| | 10) PLEASE REFER BACK TO COMMENT #14 FROM THE 1ST |
| | REVIEW AND ADD THE REQUESTED KEY NOTES TO IDENTIFY DUCT |
| | DROPS AND RISERS AND THEIR RESPECTIVE AHU'S. |
| | |
| | A) SEE SECTIONS 606.2.1 AND 606.2.3 AND SHOW THE |
| | LOCATIONS OF ALL REQUIRED DUCT SMOKE DETECTORS. |
| | |
| | B) REFER TO SECTION 607.5.4. AND PROVIDE SMOKE DAMPERS |
| | FOR ALL DUCTS LISTED BELOW THAT PENETRATE SMOKE |
| | BARRIERS, UNLESS MEETING ONE OF THE THREE EXCEPTIONS |
| | LISTED UNDER THE SECTION. |
| | M121.5- 12X10 DUCT AT SMITH GALLERY 131/RESTROOM WALL. |
| | M121.8- 38X14 & 42X14 DUCTS AT LAUDER RESTAURANT |
| | 120/LOBBY 118/CORRIDOR 113 WALLS. |
| | M122.8- 12X12 AT CONFERENCE 223/MCGRAW 225. |
| | 30X12 AT MCGRAW 225/VESTIBULE 226. |
| | 14X10 AT MARDEN 226/MCGRAW 225. |
| | M123.7- ALL DUCTS TRAVERSING THROUGH THE MARDEN GALLERY |
| | 226/ CLASSROOM 221/ THE ADMISSIONS/GRAND HALL/& OFFICES |
| | 209 & 210. |
| | M123.8- DUCTS AT CORRIDOR 301/MEP & GROSS GALLERY 304. |
| | PROVIDE KEY NOTES AT ALL FD, FSD, AND SD DAMPER |
| | LOCATIONS. |
| | |
| | C) M122.5B: SHOW HORIZONTAL DAMPERS AT DUCT |
| | PENETRATIONS OF THE FLOOR/CEILING ASSEMBLY IN THE |
| | MECHANICAL EQUIPMENT ROOM. THIS COMMENT SHALL APPLY TO |
| | ALL PLAN SHEETS SHOWING DUCTS PENETRATING HORIZONTAL |
| | MEMBRANES |
| | |
| | D) AS PREVIOUSLY REQUESTED PLEASE IDENTIFY ALL ROOMS ON |
| | THE MECHANICAL PLANS. |
| | |
| | 12) COMMENT #16: PROVIDE A CONDENSATE DISPOSAL RISER |
| | AND LAYOUT PLAN SHOWING ALL PIPING RUNS, PIPE TYPES AND |
| | SIZES, AND DISCHARGE LOCATIONS. |
| | |
| | 13) PLEASE PROVIDE A MECHANICAL SYMBOL AND LEGEND PLAN |
| | SHEET. |
| | |
| | 14) REFER TO SECTION 107.3.4.2 WPB AMENDMENTS OF THE |
| | FBC AND PROVIDE ON THE PLAN OR IN DOCUMENT FORM A LIST |
| | OF ALL MECHANICAL EQUIPMENT AND COMPONENTS THAT ARE |
| | REQUESTED TO BE DEFERRED SUBMITTALS. |
| | |
| | A) DEFERRED SUBMITTAL: 107.3.4.2 DEFERRED SUBMITTALS. |
| | FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS |
| | ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE |
| | NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT |
| | ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| | SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL |
| | HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION |
| | DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | B) DEFERRED SUBMITTAL. 2010 FBC 107.3.4.1 PRODUCT |
| | APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED BY THE |
| | DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN |
| | WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| | FOR JURISDICTIONAL APPROVAL. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |