| 2016-06-22 15:48:38 | NORTON MUSUEM |
| | PERMIT #16050512 |
| | 1ST REVIEW MECHANICAL |
| | 6/16/16 |
| | |
| | PLEASE REFER TO SECTION 107.3.5.1 WEST PALM BEACH |
| | AMENDMENTS TO THE FLORIDA BUILDING CODE- MINIMUM PLAN |
| | REVIEW CRITERIA FOR COMMERCIAL BUILDINGS. THE UPLOADED |
| | PLANS AND DOCUMENTS ARE NOT MEETING THE MINIMUM |
| | REQUIREMENTS, AND MORE DETAILS AND SUBMITTALS WILL BE |
| | REQUIRED FOR A THOROUGH REVIEW OF THE PROJECT. PLEASE |
| | REVIEW THE COMMENT LIST BELOW AND PROVIDE A RESPONSE |
| | NARRATIVE FROM THE DESIGN PROFESSIONAL CORRESPONDING TO |
| | THE RESUBMITTED AND CORRECTED PLANS AND DOCUMENTS. |
| | |
| | 1) REFER TO SECTION C408.2 FBC-14 ENERGY CONSERVATION |
| | AND PROVIDE A COMMISSIONING PLAN AS OUTLINED IN SECTION |
| | C408.2.1. |
| | |
| | 2) REFER TO SECTION C403.2.1 AND PROVIDE AC COOLING AND |
| | HEATING CALCULATIONS FOR ALL NEW SYSTEMS SHOWN IN THE |
| | PLANS AND THE SCHEDULES. |
| | |
| | 3) REFER TO SECTION C103.1.1.1.2: THE SUBMITTED ENERGY |
| | CALCULATIONS MUST BE SIGNED BY ALL OF THE DESIGN |
| | PROFESSIONALS INVOLVED WITH THE PROJECT. |
| | |
| | 4) PROVIDE MINIMUM VENTILATION CALCULATIONS IN |
| | ACCORDANCE WITH TABLE 403.3 FBC-14 MECHANICAL. PROVIDE |
| | ON THE PLAN A SCHEDULE INDICATING BOTH THE REQUIRED AND |
| | PROVIDED CFM'S OF OUTDOOR AIR FOR ALL ROOMS AND SPACES. |
| | |
| | 5) SHOW THE LOCATIONS OF ALL OUTDOOR AIR INTAKES- |
| | GRAVITY OR MECHANICAL- WITH REQUIRED CLEARANCE |
| | DISTANCES AS REQUIRED BY SECTION 401.4. |
| | |
| | 6) REFER TO SECTION 401.5 FOR ALL AIR INTAKES OPENINGS |
| | TO BE PROTECTED BY LOUVERS. PRODUCT APPROVALS AND/OR |
| | MIAMI-DADE NOA'S MUST BE LISTED ON THE PLANS AND |
| | DOCUMENTS MUST BE SUBMITTED WITH THE DESIGN |
| | PROFESSIONAL'S APPROVAL SIGNATURE. THIS INCLUDES THE 45 |
| | SF AIR INTAKE SHOWN ON M123.8. |
| | |
| | 7) PROVIDE EXHAUST VENTILATION CALCULATIONS THAT |
| | CORRELATE WITH ALL FANS SHOWN IN THE SCHEDULE AND ALL |
| | OTHER ROOMS AND SPACES REQUIRING EXHAUST PER TABLE |
| | 403.3 FBC-14 MECHANICAL, AND TABLE 6-4 ASHRAE |
| | 62.1-2010. SEE COMMENT #8 BELOW FOR THE MECHANICAL ROOM |
| | VENTILATION REQUIREMENTS. A) REFER TO SECTION 501.3.1 |
| | AND INDICATE ALL REQUIRED CLEARANCES FOR THE EXHAUST |
| | OUTLET TERMINATIONS. B) PROVIDE AIR BALANCE |
| | CALCULATIONS THAT CORRELATE WITH THE REQUIRED MINIMUM |
| | VENTILATION CALCS- SEE COMMENT #4 ABOVE. ADVISORY: |
| | SEPARATE PERMITS, PLANS, AND CALCULATIONS FOR THE |
| | KITCHEN EXHAUST HOOD AND FIRE SUPPRESSION SYSTEMS ARE |
| | REQUIRED, HOWEVER THE EXHAUST CFM'S MUST BE INCLUDED IN |
| | THE AIR BALANCE CALCULATIONS. |
| | |
| | 8) SHEET M121.7: A NEW CHILLER (CH-1) IS BEING |
| | INSTALLED IN THE EXISTING MECHANICAL ROOM. ADDITIONAL |
| | VENTILATION FOR NORMAL AND EMERGENCY VENTILATION MAY BE |
| | REQUIRED. REFER TO SECTIONS 1105.6- 1105.6.3.2 AND |
| | PROVIDE EXHAUST VENTILATION CALCULATIONS FOR BOTH |
| | NORMAL AND EMERGENCY CONDITIONS AS REQUIRED BY SECTIONS |
| | 1105.6.3.1 AND 1105.6.3.2. SHOW LOCATIONS OF ALL |
| | COMPONENTS OF THE VENTILATION SYSTEM INCLUDING EXHAUST |
| | FANS AND AIR INTAKES. INCLUDE EQUIPMENT SCHEDULES FOR |
| | ALL EXISTING FANS OR NEW FANS (EXHAUST OR INTAKE) |
| | INDICATING THEIR CAPACITIES, AND THE DIMENSIONS OF ALL |
| | AIR INTAKE OPENINGS. PLEASE NOTE: A) EF-9 SHOWN IN THE |
| | DRAWING IS NOT INCLUDED IN THE SCHEDULE. IS THIS AN |
| | EXISTING FAN? B) THE NEW CH-3 USES A DIFFERENT |
| | REFRIGERANT THAN THE EXISTING CH-1 AND CH-2, THEREFORE |
| | THE EXISTING LEAK DETECTOR MAY NOT BE COMPATIBLE. C) |
| | WHERE ARE THE NOTES OR DETAILS THAT CORRESPOND WITH THE |
| | M91, 92, 93, & 94 TAGS SHOWN AT THE MECHANICAL ROOM. |
| | THE M TAG IS USED IN OTHER PLAN LOCATIONS BUT I HAVE |
| | NOT LOCATED ANY CORRESPONDING NOTES OR DETAILS. |
| | |
| | 9) PROVIDE AN ENLARGED DRAWING OF THE MECHANICAL ROOM |
| | SHOWING ALL EQUIPMENT, PIPING LAYOUTS, WORKING |
| | CLEARANCES, EQUIPMENT ANCHORING, AND RELIEF PIPINGS AND |
| | VENTS. |
| | |
| | 10) SHEET M122.7: PROVIDE ENLARGED DRAWINGS OF THE NEW |
| | COOLING TOWERS INCLUDING SITE SPECIFIC WIND LOAD |
| | ENGINEERING FOR ANCHORING THE SUPPORT BASE TO THE ROOF |
| | STRUCTURE, AND THE TOWERS TO THE SUPPORT STEEL. PROVIDE |
| | MANUFACTURER'S SPECIFICATIONS FOR THE COOLING TOWERS |
| | APPROVED WITH SIGNATURES BY THE EOR. |
| | |
| | 11) M601: REFER TO TABLES C403.2.3(7) AND C40.2.3(8) |
| | FBC-14 ENERGY CONSERVATION AND PROVIDE IN THE EQUIPMENT |
| | SCHEDULES THE EFFICIENCY AND PERFORMANCE RATINGS FOR |
| | THE CHILLER AND THE COOLING TOWERS. SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS FOR THE CHILLER, TOWERS, |
| | AND PUMPS WITH APPROVAL SIGNATURES BY THE EOR. |
| | |
| | 12) M105: REFER TO SECTION 301.15 FBC-14 MECHANICAL AND |
| | SECTION 1609 FBC-14 BUILDING AND SHOW THE LOCATIONS OF |
| | ALL ROOFTOP MECHANICAL EQUIPMENT, AND PROVIDE WIND LOAD |
| | ENGINEERING FOR TIE DOWN OF ALL APPLIANCES, EQUIPMENT, |
| | CURBS AND STANDS TO THE ROOF STRUCTURE. A) SHOW THE |
| | REQUIRED CLEARANCE DISTANCES FOR ALL EXHAUST OUTLETS TO |
| | AIR INTAKES. B) SHOW THE CLEARANCE DISTANCS FROM THE |
| | SERVICEABLE EQUIPMENT TO THE ROOF EDGES- SECTION |
| | 304.11. |
| | |
| | 13) M601: AHU'S 23, 30, 31, 32, 33, & 34 LISTED AS NEW |
| | IN THE SCHEDULE ARE NOT SHOWN IN THE ENERGY |
| | CALCULATIONS. PLEASE DARKEN THE PRINTED NOTES UNDER THE |
| | AHU SCHEDULE- THEY ARE TOO FAINT TO READ. |
| | |
| | 14) SHEETS M121.7- M123.8B, 1ST, 2ND, & 3RD FLOOR |
| | MECHANICAL PLANS: MANY OF THE SAME DEFICIENCIES AND |
| | OMISSIONS EXIST ON ALL OF THESE PLAN SHEETS. IT MAY BE |
| | HELPFUL TO ADD KEY NOTES TO ALL THESE SHEETS AND LEGEND |
| | SYMBOLS TO CLARIFY THE SCOPE OF WORK AND EXPEDITE THE |
| | REVIEW, I.E. IT IS DIFFICULT TO TELL WHICH AC SYSTEMS |
| | THE DUCT DROPS ARE CONNECTED TO. AN AC LABEL AT THESE |
| | LOCATIONS WOULD BE VERY HELPFUL A) DUCT SMOKE DETECTORS |
| | IN THE RETURN AIR SYSTEMS NOT SHOWN- SEE SECTIONS |
| | 606.2.1 AND 606.2.3. B) FIRE AND SMOKE DAMPERS NOT |
| | SHOWN AT DUCTS PENETRATED FIRE AND SMOKE BARRIERS AND |
| | PARTITIONS. IT MAY BE HELPFUL TO OVERLAY THE WALLS ON |
| | THE MECHANICAL PLAN THAT ARE FIRE OR SMOKE RATED, AND |
| | AGAIN, KEY NOTES ARE HELPFUL FOR LOCATING REQUIRED |
| | DAMPERS AND DUCT SMOKE DETECTORS. C) IDENTIFY AND LABEL |
| | ALL DUCT SHAFTS AND PIPE CHASES. D) LABEL ALL DIFFUSERS |
| | AND RETURN GRILLS ON THE PLANS AND INCLUDE THE CFM |
| | AIRFLOW RATES- MANY OF THE SLOT AND CEILING DIFFUSERS |
| | ON THE PLANS ARE NOT LABELED. E) MANY OF THE BRANCH AND |
| | TRANSFER DUCT SIZES ARE NOT INDICATED AS WELL AS SOME |
| | OF THE MAIN DUCT TRUNKS. F) INSTALLATION AND SUPPORT |
| | DETAILS FOR THE AIR HANDLERS NOT SHOWN. G) SHOW ACCESS |
| | PANEL LOCATIONS FOR MAINTENANCE AND REPLACEMENT OF THE |
| | AIR HANDLERS AND ALL OTHER ABOVE CEILING EQUIPMENT. H) |
| | IDENTIFY ALL ROOMS AND SPACES ON THE PLANS (THE PRINT |
| | IS VERY FAINT). PLEASE REVIEW AND REVISE THE PLANS |
| | ACCORDINGLY. |
| | |
| | 15) PLEASE REVIEW SECTION C403.2.4.4 (SHUTOFF DAMPER |
| | CONTROLS), AND C403.2.5.1 (DEMAND CONTROLLED |
| | VENTILATION) AND REVISE THE PLANS TO SHOW COMPLIANCE |
| | WHERE REQUIRED. |
| | |
| | 16) REFER TO SECTION 307 AND PROVIDE PRIMARY AND |
| | SECONDARY CONDENSATE DISPOSAL PLANS FOR THE AIR |
| | HANDLERS. |
| | |
| | 17) PROVIDE EQUIPMENT SCHEDULES FOR THE BOILERS AND |
| | SHOW THEIR LOCATIONS ON THE PLANS. |
| | |
| | 18) SHOW THE LOCATION OF THE ERU-1S ON THE PLANS. |
| | |
| | 19) THE MECHANICAL REVIEW IS SUSPENDED AT THIS TIME DUE |
| | TO DEFICIENCIES IN THE PLANS AND THE LACK OF |
| | SUBMITTALS. PLEASE NOTE THAT THERE MAY BE ADDITIONAL |
| | COMMENTS AFTER REVISED AND CORRECTED PLANS ARE |
| | RESUBMITTED FOR REVIEW. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |