| Plan Review Notes For Permit 16050444 |
| Permit Number |
16050444 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-05-31 06:39:21 | 1) SHOW THE DISTANCE OF THE LP TANK FROM THE BUILDING | | | WALL. COMPLY WITH NFPA 58 SEC.6.3.2.3 - NO PART OF AN | | | UNDERGROUND OR MOUNDED ASME CONTAINER | | | SHALL BE LESS THAN 10 FT (3 M) FROM A BUILDING OR LINE | | | OF ADJOINING PROPERTY THAT CAN BE BUILT UPON | | | 2) SHOW THE DISTANCE OF THE LP TANK TO THE | | | DRIVEWAY.INSTALLATIONS WITHIN 10 FT (3 M) OF A PUBLIC | | | VEHICULAR THOROUGHFARE OR DESIGNATED PARKING LOCATION | | | SHALL BE PROVIDED WITH | | | VEHICULAR BARRIER PROTECTION FOR THE CONTAINER?S | | | FITTING HOUSING, COMPLY WITH NFPA 58 SEC.6.6.6.1 (C) & | | | (E) - THE INSTALLATION OF A BURIED CONTAINER SHALL | | | INCLUDE PROTECTIONFOR THE CONTAINER AND PIPING AGAINST | | | PHYSICAL DAMAGE | | | FROM VEHICULAR TRAFFIC. | | | 3) SUBMIT COMPLETE MANUFACTURER'S | | | SPECIFICATIONS/INSTALLATIONN MANUAL FOR REVIEW. THE | | | GENERATOR SHALL BE UL 2200 LISTED AND BE INSTALED IN | | | ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION | | | INSTRUCTIONS AND NFPA 37. 2014 FBC-FUEL GAS SEC.616.1. | | | 4) THE GAS SHALL BE SUBMITTED AS A SEPARATE PERRMIT. | | | 5) SUBMIT DETAILS AS TO HOW THE LP TANK WILL BE | | | ANCHORED TO PREVENT FLOTATION. NFPA 58 SEC. 6.6.1.6. | | | 6) GAS SHALL BE DONE UNDER A SEPARATE PERMIT. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | |
|