| 2016-06-29 18:00:07 | FAILED |
| | |
| | 1) REPEAT COMMENT: THE SITE WALL ON SHEET G2.1 IS |
| | DIFFERENT FROM THE SITE WALL ON SHEET S-1.1. ALL PLANS |
| | SHALL SHOW SAME CONDITIONS. THE SOUTHERN PORTION OF THE |
| | WALL SHOWN ON SHEET G2.1 RUNS EAST/WEST AND IS NOT |
| | SHOWN ON SHEET S-1.1. THE REFERENCED DETAILS ON SHEETS |
| | 3.1 AND 3.3 STATE "SEE STRUCTURAL PLANS", YET THESE ARE |
| | NOT SHOWN ON THE PROVIDED PLANS. |
| | |
| | 2) REPEAT COMMENT: THE PROPOSED WALL BLOCKS THE |
| | EXISTING PEDESTRIAN ACCESS EASEMENT. PROVIDE A PLAN |
| | THAT SHOWS HOW THE PEDESTRIAN ACCESS ACROSS THE SITE |
| | WILL BE MAINTAINED DURING THE CONSTRUCTION OF THE WALL. |
| | PLEASE NOTE THAT THE PEDESTRIAN ACCESS SHALL NOT BE |
| | IMPEDED DURING ANY PHASE OF CONSTRUCTION. CONDITION F |
| | OF THE RIGHT-OF-WAY PERMIT STATES THAT SAFE PASSAGEWAYS |
| | FOR PEDESTRIANS SHALL BE PROVIDED THRU THE WORK SITE. |
| | |
| | 3) TAGS ON SHEET G2.1 WHICH REFERENCE SPECIFIC DETAILS |
| | ARE INCORRECTLY ORIENTED - EX. 06/G3.3 AND 03/G3.3. ALL |
| | DETAIL DRAWINGS SHALL BE CORRECTLY REFERENCED. |
| | |
| | 4) PLEASE PROVIDE THE CROSS SECTION FOR HOW THE TRENCH |
| | DRAINS INTERACT WITH THE PENETRATION TO THE SITE WALL |
| | GIVEN THAT THERE IS A LARGE ELEVATION DIFFERENCE |
| | BETWEEN THE LEVEL OF THE PAVERS ON THE INSIDE OF THE |
| | SITE WALL AND THE DRAINAGE SWALE. |
| | |
| | 5) THERE IS A POSSIBLE CONFLICT BETWEEN THE EXISTING |
| | STORMWATER AND SANITARY SEWER PIPES (SEE SIMMONS & |
| | WHITE PAVING AND DRAINAGE PLAN) AND THE PROPOSED WALL |
| | LOCATION. PROVIDE A CROSS SECTION THAT SHOWS THE DEPTH |
| | OF THE PIPES IN RELATIONSHIP TO THE PROPOSED SITE WALL |
| | FOOTERS TO VERIFY THAT THERE IS NO CONFLICT WITH THE |
| | CITY INFRASTRUCTURE. ALTERNATIVELY, PROVIDE |
| | VERIFICATION THAT THE PIPES HAVE BEEN RE-ROUTED PRIOR |
| | TO APPROVAL OF THE SITE WALL PERMIT. |
| | |
| | 6) STAFF HAS NOTED THAT THE ARCHITECTURAL PLANS |
| | SUBMITTED AS PART OF THIS APPLICATION INCORRECTLY SHOW |
| | THE PEDESTRIAN WALKWAY AT THE SOUTHWEST CORNER OF THE |
| | SITE. THE PROPOSED TRANSFORMER MAY NOT BE LOCATED AS |
| | SHOWN. THE PEDESTRIAN WALKWAY IS IN AN EASEMENT AS |
| | SHOWN ON THE CIVIL PLAN. |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
| | |
| | |