| Date |
Text |
| 2016-06-01 16:39:59 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #16050258 |
| | 6/1/16 |
| | |
| | 1) SUBMIT ENERGY CALCULATIONS IN COMPLIANCE WITH |
| | SECTIONS C101.4.4 & C401.2 FBC-14 ENERGY CONSERVATION. |
| | |
| | 2) THE AC CALCULATIONS ON SHEET M006 DO NOT INCLUDE THE |
| | HEATING LOAD, DO NOT INCLUDE A SPACE LOAD FOR THE |
| | KITCHEN, DO NOT SHOW A TOTAL LATENT LOAD, AND DO NOT |
| | APPEAR TO BE PERFORMED IN ACCORDANCE WITH THE |
| | ASHRAE/ACCA STANDARD 183 OR ACCA MANUAL N. PLEASE |
| | CLARIFY WHAT PROCESSES ARE CONTRIBUTING TO THE "PROCESS |
| | LOADS" SHOWN IN THE CALCS. |
| | |
| | 3) REFER TO SECTION C403.2.2: RTU 1 & 2 PER THE |
| | SCHEDULE HAVE A COMBINED TOTAL CAPACITY OF 30 TONS |
| | (360,000 BTUH) WHICH EXCEEDS THE TOTAL 241,000 BTUH |
| | LOAD IN THE CALCULATION. |
| | |
| | 4) PROVIDE THE WIND LOAD DESIGN CRITERIA AND |
| | ENGINEERING FOR INSTALLATION OF THE RTU'S AND THE |
| | EXTERIOR DUCTWORK- SECTION 301.15. |
| | |
| | 5) SHEET M004: PROVIDE DETAILS FOR INSTALLATION OF THE |
| | GUARDRAIL SHOWN ON THE ROOF BY THE RTU'S- SEE SECTION |
| | 304.11. |
| | |
| | 6) SHUTOFF DAMPER CONTROLS FOR THE O/A SUPPLY ARE |
| | REQUIRED PER SECTION C403.2.4.4 FBC-14 ENERGY |
| | CONSERVATION. |
| | |
| | 7) DEMAND CONTROLLED VENTILATION IS REQUIRED FOR THE |
| | DINING ROOM- SECTION C403.2.5.1. REVISE THE PLAN TO |
| | SHOW COMPLIANCE. |
| | |
| | 8) INDICATE THE TYPE OF EXTERIOR DUCTWORK TO BE |
| | INSTALLED AND THE INSULATION R-VALUE. |
| | |
| | 9) PROVIDE A CONDENSATE DISPOSAL PLAN- SECTION 307. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |