| 2016-07-12 09:17:25 | 2ND REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #16050249 |
| | 7/12/16 |
| | |
| | 1) SHEETS M0.02 & M1.01: EF-1 HAS A CAPACITY OF 1075 |
| | CFMS, HOWEVER THE PLAN INDICATES A TOTAL OF 1150 CFMS |
| | REQUIRED. |
| | |
| | 2) M0.02 & M1.01: EF-10 HAS A CAPACITY OF 100 CFRMS, |
| | HOWEVER THE PLAN INDICATES A TOTAL OF 200 CFMS |
| | REQUIRED. |
| | |
| | 3) M0.02 & M1.01: AHU-5 HAS A TOTAL SUPPLY AND O/A |
| | CAPACITY OF 3100 CFMS, HOWEVER THE PLAN IS INDICATING A |
| | LESSER AMOUNT OF 2815 CFMS OF AIR BEING SUPPLIED. AS |
| | THIS UNIT IS PROVIDING 100 % AIR FOR EXHAUST, PLEASE |
| | REVIEW THE PLAN FOR ANY POSSIBLE SUPPLY DIFFUSER |
| | OMISSIONS. |
| | |
| | 4) M0.02 & M1.01, AHU-5 O/A SCHEDULE SHOWS 520 CFMS OF |
| | EXHAUST AIR FOR THE WOMEN'S LOCKER/SHOWER ROOM, HOWEVER |
| | THE PLAN IS INDICATING A LESSER AMOUNT OF 450 CFMS. |
| | |
| | 5) THE AC COOLING AND HEATING CALCULATIONS, AND THE |
| | ENERGY CALCULATIONS WERE NOT RESUBMITTED WITH THE |
| | CORRECTED PLANS. |
| | |
| | 6) AS PREVIOUSLY REQUESTED IN 1ST REVIEW COMMENT #4B, |
| | PLEASE PROVIDE DETAILS OR NOTES ON THE PLAN INDICATING |
| | COMPLIANCE FOR O/A INTAKE AND EXHAUST TERMINATION |
| | LOCATION CLEARANCES- SEE SECTIONS 401.4 & 501.3.1. |
| | |
| | 7) IN REFERENCE TO 1ST REVIEW COMMENT #5, CLARIFY IF |
| | THE AIR HANDLERS WILL BE LINKED TOGETHER FOR FAN |
| | SHUTDOWN IF ANY SINGLE DUCT SMOKE DETECTOR ACTIVATES. |
| | |
| | 8) AS PREVIOUSLY REQUESTRED IN 1ST REVIEW COMMENT #8B, |
| | PROVIDE MAKEUP AIR FOR THE DRYERS. THE RESPONSE FROM |
| | JLRD REFERENCES THE AHU-5 TABLE HOWEVER AHU-5 IS NOT |
| | SERVING THE LAUNDRY ROOM. |
| | |
| | 9) ADVISORY: IN REFERENCE TO JLRD RESPONSE TO 1ST |
| | REVIEW COMMENT #10, A SPECIALTY ENGINEER WILL PROVIDE |
| | THE WIND DESIGN CRITERIA FOR THE EXTERIOR MECHANICAL |
| | EQUIPMENT INSTALLATIONS. PLEASE NOTE TRHAT A HOLD WILL |
| | BE PLACED ON MECHANICAL INSPECTIONS UNTIL THE |
| | ENGINEERING IS SUBMITTED AND APPROVED. |
| | |
| | 10) M1.01, M1.02, & M1.03: PLEASE SHOW THE REQUIRED |
| | ACCESS PANELS ON THE PLANS FOR ALL ABOVE CEILING |
| | EXHAUST FANS- SECTION 306.1. |
| | |
| | 11) M1.01, M1.02, & M1.03: SHOW THE REQUIRED SMOKE |
| | DAMPERS FOR DUCT PENETRATING SMOKE WALLS AT CORRIDORS |
| | 132 & 200- SECTION 607.5.4. |
| | |
| | 12) M3.03: PROVIDE A SMOKE DAMPER DETAIL AND INDICATE |
| | WHERE THE FIRE DAMPERS SHOWN ON THIS PLAN SHEET CAN BE |
| | FOUND ON THE HVAC FLOOR PLANS. |
| | |
| | 13) REFER TO SECTION C403.2.7.2 FBC-14 ENERGY |
| | CONSERVATION AND PROVIDE NON-COMBUSTIBLE DOORS FOR ALL |
| | MECHANICAL CLOSETS, UNLESS THE RETURN DUCTS ARE |
| | DIRECTLY CONNECTED TO THE AIR HANDLERS. |
| | |
| | 14) ADVISORY: JLRD HAS REQUESTED DEFFERRED SUBMITTALS |
| | FOR PRODUCTS INCLUDING O/A INTAKE AND EXHAUST LOUVERS, |
| | AND DUCT SMOKE DETECTORS. PLEASE REVIEW THE FOLLOWING |
| | SECTIONS FOR THE WPB AMENDMENTS TO THE FBC: |
| | |
| | DEFERRED SUBMITTAL: 107.3.4.2 DEFERRED SUBMITTALS. FOR |
| | THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE |
| | DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT |
| | SUBMITTED AT THE TIME OF THE |
| | APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| | BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| | OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| | THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| | DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| | REVIEW BY THE BUILDING OFFICIAL. |
| | |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |
| | DEFERRED SUBMITTAL. 2010 FBC 107.3.4.1 PRODUCT |
| | APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED BY THE |
| | DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN |
| | WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL |
| | FOR JURISDICTIONAL APPROVAL. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |