| Date |
Text |
| 2016-05-04 16:16:19 | 1ST ELECTRICAL REVIEW NOTES |
| | REVIEWED FOR COMPLIANCE WITH: |
| | 5TH EDITION FBC 2014 & NFPA 70 2011 (NEC) |
| | |
| | CORRECTIONS REQUIRED: |
| | 1. NEC 422.31(B), A DISCONNECT IS MISSING FOR THE |
| | ELECTRIC WATER HEATER. |
| | 2. LABEL FOR PANEL N ON THE SCHEDULE INDICATES EXISTING |
| | WHILE THE RISER SAYS IT IS NEW. CORRECT TO MATCH AND |
| | CLARIFY. |
| | 3. NEC 110.16 ALL ELECTRICAL EQUIPMENT SHALL BE MARKED |
| | WITH THE ARC-FLASH HAZARD WARNING LABELS. |
| | 4. NEC110.24 ALL ELECTRICAL APPARATUS SHALL BE DURABLY |
| | DATE MARKED WITH THE MAXIMUM AVAILABLE FAULT CURRENT. |
| | 5. NEC 215.5 ALONG WITH THE RISER DIAGRAM YOU NEED TO |
| | SUBMIT LOAD CALCS FOR THE ADDED LOAD. |
| | 6. FBC-EC405 MANDATORY LIGHTING CONTROLS ARE REQUIRED. |
| | LIGHTING CONTROL MISSING FOR ROOMS 1007, 108 & 109. |
| | 7. FBC-EC405.5.2 PROVIDE A LIGHT DENSITY ALLOWANCE |
| | CHART SHOWING ENERGY CODE COMPLIANCE. |
| | |
| | WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR |
| | RE-SUBMITTAL, PLEASE PROVIDE A RESPONSE LETTER |
| | (NARRATIVE) ADDRESSING EACH ITEM AND THE PAGE NUMBER |
| | WHERE THE CORRECTIONS APPEAR ALONG WITH THE STANDARD |
| | CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PAGES INTO THE SUBMITTAL PACKAGE. MARK VOID |
| | AND LEAVE THE PREVIOUSLY REVIEWED SHEETS FOR |
| | COMPARATIVE REVIEW. CLOUDING THE CHANGES WILL BE |
| | GREATLY APPRECIATED. |
| | |
| | IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO |
| | CONTACT ME DIRECTLY. |
| | |
| | THANK YOU, |
| | MIKE ALBARRAN |
| | ELECTRICAL PLANS EXAMINER |
| | PH: 561-805-6746 |
| | EMAIL: [email protected] |
| | |