| Plan Review Notes For Permit 16041276 |
| Permit Number |
16041276 |
|
| Review Stop |
M |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-05-10 15:17:17 | 1ST REVIEW: FBC 2014 MECHANICAL | | | PERMIT #16041276 | | | 5/10/16 | | | | | | 1) M1.1: THE VENTILATION CALCULATIONS DO NOT INCLUDE | | | BREAKDOWNS FOR THE CLASSROOMS AND THE ACTIVITY ROOM. | | | 2) M1.1: THE VENTILATION CALCULATIONS APPEAR TO BE | | | INCORRECT FOR THE MULTI-USE ASSEMBLY WHICH MUST BE | | | BASED ON AN OCCUPANT DENSITY OF 100 PERSONS PER 1000 SF | | | PER TABLE 403.3. | | | 3) REFER TO SECTION 507.2.2 FBC-14 MECHANICAL AND | | | PROVIDE SPECIFACATIONS FOR THE OVEN AND MICROWAVE IN | | | THE KITCHENETTE. IF A HEAT HOOD IS NOT TO BE INSTALLED | | | PROVIDE AN EXHAUST VENTILATION CALCULATION, | | | 4) REFER TO SECTION C403.2.5.1 FBC-14 ENERGY | | | CONSERVATION: DEMAND CONTROLLED VENTILATION IS REQUIRED | | | FOR THE MULTI-USE ASSEMBLY ROOM, ACTIVITY ROOM, AND | | | CLASSROOMS. INDICATE A MEANS OF COMPLIANCE ON THE PLANS | | | AND PROVIDE SPECIFICATIONS. | | | 5) PROVIDE A MECHANICAL ROOF PLAN WITH CLEARANCE | | | DISTANCE MEASUREMENTS FOR THE O/A INTAKES TO EXHAUST | | | OUTLETS AND VENTS, AND THE DISTANCES FROM EQUIPEMENT TO | | | ROOF EDGES- SEE SECTIONS 401.4 AND 304.11. | | | 6) PROVIDE WIND LOAD TIE-DOWN ENGINEERING FOR | | | INSTALLATION OF THE RTU'S AND RTU CURBS- SECTION | | | 301.15. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|