| Date |
Text |
| 2016-05-02 16:24:35 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #16041215 |
| | 5/2/16 |
| | |
| | 1) THE IAQ PROCEDURE FOR OUTDOOR AIR INTAKE REQUIRES |
| | SUBMITTAL OF DESIGN DOCUMENTATION AS INDICATED IN |
| | SECTION 6.3.6 ASHRAE 62.1-2010: |
| | 6.3.6 DOCUMENTATION. WHEN THE IAQ PROCEDURE IS USED, |
| | THE FOLLOWING INFORMATION SHALL BE INCLUDED IN THE |
| | DESIGN DOCUMENTATION: THE CONTAMINANTS OF CONCERN |
| | CONSIDERED IN THE DESIGN PROCESS, THE SOURCES AND |
| | EMISSION RATES OF THE CONTAMINANTS OF CONCERN, THE |
| | CONCENTRATION LIMITS AND EXPOSURE PERIODS AND THE |
| | REFERENCES FOR THESE LIMITS, AND THE ANALYTICAL |
| | APPROACH USED TO DETERMINE VENTILATION RATES AND AIR |
| | CLEANING REQUIREMENTS. THE CONTAMINANT MONITORING AND |
| | OCCUPANT AND/OR VISITOR EVALUATION PLANS SHALL ALSO BE |
| | INCLUDED IN THE DOCUMENTATION. |
| | PLEASE REVIEW ALL SUB-SECTIONS LISTED UNDER 6.3 AND |
| | SHOW COMPLIANCE. |
| | |
| | 2) SHEET M-001: PLEASE UPDATE THE ASHRAE 62.1-2007 |
| | REFERENCE SHOWN IN THE O/A TABLE TO THE CURRENT 2010 |
| | EDITION. |
| | |
| | 3) M-001: IT APPEARS THAT THE SYSTEM DATA IN THE AC |
| | SCHEDULE FOR AHU-11 IS LISTED UNDER AHU-12 AND VICE |
| | VERSA. PLEASE REFER TO THE SUBMITTED AC SUMMARY |
| | CALCULATIONS, AND THE AC LAYOUT PLAN ON SHEET M-101 |
| | WHERE THE SYSTEMS APPEAR TO BE MISLABELED. |
| | |
| | 4) M-001: EDUCATIONAL SCIENCE LABORATORIES REQUIRE |
| | EXHAUST SYSTEMS AT A RATE OF 50CFM'S PER SF. PLEASE |
| | CLARIFY WHAT TYPE OF ACTIVITIES WILL BE CONDUCTED IN |
| | THE SCIENCE ROOM, AND ALSO INDICATE IF THERE WILL BE AN |
| | ART CLASSROOM WHICH ALSO REQUIRES AND INDEPENDENT |
| | EXHAUST SYSTEM. REVISE THE PLANS TO SHOW COMPLIANCE. |
| | |
| | 5) M-001: THE O/A SCHEDULE LISTS #122 AS "LARGE SPACE |
| | IN THE CENTER". PLEASE BE MORE SPECIFIC REGARDING THE |
| | USE OF THIS AREA. WHY WOULD THE O/A RATE FOR THIS AREA |
| | BE ANY LESS THAN THE PIAZZA? |
| | |
| | 6) M-003: PLEASE CORRECT THE HVAC DESIGN TABLE |
| | INDICATING NO DUCT SMOKE DETECTORS. |
| | |
| | 7) M-101: THE PLAN INDICATES 2360 CFM'S OF SUPPLY AIR |
| | FOR THE 4-TON SYSTEM WHICH IS CAPABLE OF PRODUCING |
| | MAXIMUM 1600 CFM'S ACCORDING TO THE AC SCHEDULE. |
| | |
| | 8) M-101: THE EXHAUST IN ROOM 112A NEEDS TO BE |
| | INCREASED TO ACCOMODATE THE LOCKERS OR DRESSING AREA- |
| | TABLE 6-4 ASHRAE 62.1-10. |
| | |
| | 9) M-102: PLEASE CLARIFY THE USE OF THE MOTORIZED |
| | DAMPER IN THE COMMON WALL BETWEEN CLASSROOMS 202 & 203. |
| | |
| | 10) A050: REFER TO SECTION C101.4.4 FBC-14 ENERGY |
| | CONSERVATION. THE BUILDING CODE DATA INDICATES THE |
| | PROJECT IS A "CHANGE OF OCCUPANCY". PLEASE PROVIDE |
| | ENERGY CALCULATIONS. |
| | |
| | 11) PROVIDE AC CALCULATIONS FOR THE WAC-1 SYSTEM. |
| | |
| | 12) REFER TO SECTIONS C403.2.7.2 AND C403.2.7.3 FBC |
| | ENERGY CONSERVATION AND REPLACE THE WOOD DOORS ON THE |
| | MECHANICAL CLOSETS WITH NON-COMBUSTIBLE DOORS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |