| 2016-12-29 08:14:10 | 5TH REVIEW FBC-2014 MECHANICAL |
| | PERMIT #16041117 |
| | 12/28/16 |
| | |
| | THE FOLLOWING REVIEW IS BASED ON THE REVISED PLANS FROM |
| | MESSLER AND ASSOCIATES DATED 12/14/16 |
| | |
| | 1) CORRECT SCOPE OF WORK #8 ON THE COVER SHEET THAT |
| | INDICATES NO CHANGE TO THE AC SYSTEM TO MATCH THE SCOPE |
| | OF WORK SHOWN. |
| | |
| | 2) THE REVISED PLAN IS NOW INDICATING TWO 5-TON RTU'S A |
| | SHARING A RETURN AIR PLENUM WHICH REQUIRES A SMOKE |
| | DETECTOR PER SECTION 606.2.2. |
| | |
| | 3) THE EQUIPMENT SCHEDULE FOR THE NEW 5-TON SYSTEM IS |
| | INCOMPLETE- PROVIDED THE MANUFACTURER, THE AHRI |
| | CERTIFICATION NUMBER, AND THE ELECTRICAL DATA. |
| | |
| | 4) PROVIDE AN EQUIPMENT SCHEDULE FOR THE NEW TOILET |
| | ROOM EXHAUST FAN, AND SHOW THE EXHAUST DUCT TERMINATION |
| | LOCATION. |
| | |
| | 5) THE COMBUSTION AIR CALCULATION INDICATES A SHORTAGE |
| | OF 9937 CU. FT. OF INDOOR SPACE. PLEASE CLARIFY HOW THE |
| | SHORTAGE WILL BE COMPENSATED FOR. IF THE AIR IS TO BE |
| | SUPPLIED MECHANICALLY REFER TO SECTION 304.9 FUEL GAS |
| | AND PROVIDE A CALCULATION. |
| | |
| | 6) THE AC CALCULATIONS INDICATE A HEATING LOAD OF 39864 |
| | BTUH. THE AC SCHEDULE INDICATES A SHORTAGRE OF 17664 |
| | BTUH. |
| | |
| | 7) PLEASE REMOVE THE AC LAYOUT PLANS FROM THE AC |
| | CALCULATIONS UNLESS THEY ARE TO BE USED ON THE |
| | PROJECT.\ |
| | |
| | 8) REFER TO SECTION 301.15 AND PROVIDE SITE SPECIFIC |
| | WIND LOAD ENGINEERING FOR INSTALLATION OF THE NEW RTU |
| | IN COMPLIANCE WITH SECTION 1609 FBC-14 BUILDING. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |