| 2016-12-05 16:50:08 | 4TH REVIEW FBC-2014 MECHANICAL | | | PERMIT #16041117 | | | 12/5/16 | | | | | | 1) THE REVISED SHEET 2 SHOWS THE NEW 5TON AIR HANDLER | | | PRODUCING 3267 CFMS, HOWEVER PER THE SCHEDULE THE | | | SYSTEM IS LIMITIED TO 2000 CFMS. IF THERE IS A SECOND | | | AIR HANDLER IN THE CLOSET PLEASE SHOW IT AND REDESIGN | | | THE DUCT LAYOUT ACCORDINGLY. | | | | | | 2) THE REVISED SHEET 2 SHOWS TWO 5TON PACKAGED UNITS IN | | | A SECTION DRAWING AT THE TOP RIGHT OF THE PAGE. THE | | | SCHEDULE SHOWS ONLY ONE PACKAGE UNIT- PLEASE CORRECT | | | AND PROVIDE GUARDS AT THE ROOF EDGES IN COMPLIANCE WITH | | | SECTION 304.11. | | | | | | 3) AS PREVIOUSLY NOTED, THE SUMMARY AC LOAD | | | CALCULATIONS MUST BEAR THE SIGNATURE AND SEAL OF THE | | | ENGINEER OF RECORD. | | | | | | 4) AS PREVIOUSLY REQUESTED, PROVIDE AN AIR BALANCE | | | CALCULATION. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|