| 2016-11-08 09:23:49 | 3RD REVIEW FBC-2014 MECHANICAL |
| | PERMIT #16041117 |
| | 11/1/16 |
| | |
| | 1) THE AC PLANS AND SUBMITTALS ARE IN CONFLICT: |
| | |
| | A) SHEET 2 SHOWS A GROUND-MOUNTED 10 TON CONDENSER, |
| | SHEET 3 SHOWS A 5-RON ROOF MOUNTED CONDENSER. |
| | B) THE RESPONSE NARRATIVE INDICATES A REPLACED 5-TON |
| | SYSTEM AND A NEW 5-TON SYSTEM TO BE INSTALLED. |
| | CONSISTENTLY LABEL AND IDENTIFY THE LOCATIONS OF THE |
| | TWO SYSTEMS ON SHEETS 2 & 3. |
| | C) NEITHER SHEET 2 OR 3 PROVIDE COMPLETE DUCT LAYOUT |
| | PLANS. SHEET 2 DOES NOT SHOW ANY AIR DISTRIBUTION IN |
| | THE JUICE BAR AREA OR DINING ROOM. AN AIR DISTRIBUTION |
| | PLAN FROM ENERGY HOUSE TECHNOLOGY HAS BEEN SUBMITTED |
| | ALONG WITH CALCULATIONS THAT DO NOT MATCH WITH SHEET 2. |
| | D) THE SUBMITTED AC LOAD SUMMARY CALCULATIONS MUST BE |
| | SIGNED AND SEALED BY AN ENGINEER PER SECTION C403.2.1 |
| | EXCEPTION FBC-14 ENERGY CONSERVATION. |
| | E) THE 10" DUCTS SUPPLYING 500 CFMS OF AIR ON SHEET 2 |
| | ARE UNDERSIZED AT 0.1 FRICTION RATE. |
| | |
| | 2) AS PREVIOUSLY REQUESTED PROVIDE AC EQUIPMENT |
| | SCHEDULES ON THE PLAN. |
| | |
| | 3) AS PREVIOUSLY PROVIDE AIR BALANCE CALCULATIONS. |
| | |
| | 4) AS PREVIOUSLY REQUESTED PROVIDE A ROOF PLAN SHOWING |
| | ALL REQUIRED CLEARANCE DISTANCE MEASUREMENTS FOR AIR |
| | INTAKES TO EXHAUST OUTLETS, AND FROM EQUIPMENT TO ROOF |
| | EDGES. |
| | |
| | 5) MANUFACTURER'S SPECIFICATIONS FOR A GAS-FIRED |
| | CHARBROILER AND VERTICAL BROILER HAVE BEEN SUBMITTED, |
| | HOWEVER NEITHER APPLIANCE IS SHOWN ON THE PLAN. PLEASE |
| | REMOVE THE SUBMITTALS OR SHOW THE LOCATIONS OF THE |
| | APPLIANCES ON NTHE PLAN. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |