| Date |
Text |
| 2016-07-31 09:51:23 | GAS |
| | |
| | 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| | LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 FBC-FUEL |
| | GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES SEC. |
| | G2413. |
| | |
| | 2. SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| | CORRUGATED STAINLESS STEEL TUBING |
| | |
| | (IF APPLICABLE) FOR EACH PIPE SIZE. WPB AMENDMENTS TO |
| | FBC SEC.107.2.1. |
| | |
| | 3. IS THE TACOS BROILER GAS OR ELECTRIC? IF IT IS GAS, |
| | ADD IT ONTO THE GAS RISER. |
| | |
| | 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (METER |
| | OR MP REGULATOR) TO THE MOST REMOTE OUTLET IN THE |
| | BUILDING AND / OR SYSTEM PER THE 2014 FBC-FUEL GAS |
| | SEC.402.4.1 OR 2014 FBC-RES. SEC. G 2413.3. |
| | |
| | 6. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2014 |
| | FBC-FUEL GAS CODE SEC.304.1 OR 2014 FBC-RES. SEC. G |
| | 2407. |
| | |
| | 7. INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| | ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. |
| | SEC. G2413.2. . |
| | |
| | 8. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND |
| | TERMINATION OF THE GAS VENTS (IF ANY) PER 2014 FBC-FUEL |
| | GAS SECS. 502 THRU 505 OR 2014 FBC-RES. SEC.G2426. |
| | |
| | 9. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 |
| | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. |
| | |
| | THE GAS SHALL BE A SEPARATE PERMIT. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |