| 2016-05-03 12:54:10 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #16040999 |
| | 5/3/16 |
| | |
| | 1) SHEET AD-1.3: PLEASE SHOW NOTE #2 LOCATIONS ON THE |
| | PLAN- MECHANICAL EQUIPMENT TO BE REMOVED. |
| | 2) THE OUTDOOR DRY BULB AND WET BULB COOLING |
| | TEMPERATURES SHOWN ON THE PLANS ARE HIGHER THAN THE |
| | TEMPERATURES INDICATED IN ACCA MANUUAL N FOR WPB WHICH |
| | ARE 90 DEGREES AND 78 DEGREES. |
| | 3) SHEET M4.1: THE VENTILATION CALCULATIONS INDICATE |
| | 1523 CFM'S OF O/A REQUIRED FOR PHASE 1, HOWEVER THE AC |
| | SCHEDULES INDICATE A TOTAL OF 1410 CFM'S TO BE |
| | PROVIDED. |
| | 4) M2.1: SEE NOTE #10 AND CLARIFY IF, UNDER THIS |
| | PHASE-1, THE OA-1 WILL SHUT DOWN ALONG WITH THE DAMPER. |
| | 5) M2.1: A DUCT SMOKE DETECTOR IS REQUIRED IN THE |
| | RETURN AIR SYSTEM OF OA-1- SECTION 606.2.1. |
| | 6) M2.1 & M6.1: THE CONTROL DIAGRAM FOR RTU-1-2 IS |
| | ERRONEOUSLY SHOWING CONNECTION TO OA-1. |
| | 7) M2.1: INDICATE HOW O/A IS BEING PROVIDED TO STORAGE |
| | ROOM 100A |
| | 8) M5.2 & S3.4: PROVIDE COMPLETE ENGINEERED DETAILS FOR |
| | INSTALLATION OF THE ROOFTOP UNITS, AND SUBMIT A FL. |
| | PRODUCT APPROVAL OR MIAMI-DADE NOA FOR THE THYBAR CURBS |
| | APPROVED WITH SIGNATURE BY THE EOR. PLEASE NOTE THE |
| | STRUCTURAL DETAIL SHOWS A WELDED CONNECTION FOR THE |
| | CURB TO THE ROOF STRUCTURE. |
| | 9) PROVIDE WIND LOAD ENGINEERING FOR THE INSTALLATION |
| | OF CU-1-3 ON THE HOUSEKEEPING- SECTION 301.15. |
| | 10) PROVIDE A FLORIDA PRODUCT APPROVAL OR MIAMI-DADE |
| | NOA FOR THE EXHAUST LOUVERS. |
| | 11) THE EOR MUST COMPLETE HIS MANDATORY REQUIREMENTS |
| | CHECKLIST ON PAGE 10 OF THE ENERGY COMPLIANCE |
| | SUBMITTAL. |
| | 12) REFER TO SECTION C403.3.1.1.1: THE ECONOMIZER SHALL |
| | BE CAPABLE OF MODULATING OUTDOOR AIR AND RETURN AIR |
| | DAMPERS TO PROVIDE UP TO 100 PERCENT OF THE DESIGN |
| | SUPPLY AIR QUANTITY AS OUTDOOR AIR FOR COOLING. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |