| | 1.) SHT. 5 OF 7 - THE PLANS SHOW TWO OF THE WATER |
| | SEVICES AS ONE INCH AND ALSO AS AN INCH AND A HALF. |
| | WHICH ONE IS IT? CLARIFY. |
| | 2) SHOW THE CLEAR INSIDE DIMENSIONS (LXW) OF BOTH |
| | ACCESSIBLE TOILET ROOMS ON THE PLANS. WPB AMEND. TO FBC |
| | SEC. 107.2.1. 2ND REQUEST. |
| | 3) SHOW THE REQUIRED CLEAR FLOOR SPACE FOR THE LAVATORY |
| | IN EACH TOILET ROOM. COMPLY WITH 2014 FBC-ACCESS. |
| | SECS.305, & 606.2. 2ND REQUEST. |
| | 4) SHOW THE REQUIRED CLEAR FLOOR SPACE FOR THE DRINKING |
| | FOUNTAINS. COMPLY WITH 2014 FBC- ACCESS. SECS.211 & |
| | 602.SUBMIT A DRINKING FOUNTAIN DETAIL FOR REVIEW. |
| | 5) SHT. 5 OF 7 - THE PLANS SHOW THE SANITARY SEWER |
| | CROSSING THE WATER SERVICE. THIS IS A VIOLATION AND |
| | CANNOT REMAIN AS DESIGNED. COMPLY WITH 2014 |
| | FBC-PLUMBING SECS. 603.2, 703.1. |
| | 6) A BACKFLOW PREVENTION DEVICE IS REQUIRED FOR EACH |
| | BUILDING, NOT ONE FOR BOTH BUILDINGS. 2014 FBC - |
| | PLUMBING SECS. 608.1, |
| | 7) DRINKING FOUNTAINS ARE NOT PERMITTED IN THE TOILET |
| | ROOMS PER 2014 FBC-PLUMBING SEC.410.4. |
| | 8) SHT. 5 OF 7 SHOWS PVC PIPE SUPPLYING HOSE BIBBS. |
| | THIS BRANCH FOR THE HOSE BIBBS IS CONSIDERED PART OF |
| | THE WATER DISTRIBUTION SYSTEM AND PVC IS NOT PERMITTED |
| | FOR THIS USE PER 2014 FBC-PLUMBING SEC. 605.4 & TABLE |
| | 605.4. |
| | 9) SHTS. 3 & 4 OF 13 SHOW WHAT APPEARS TO BE A DRAIN |
| | LINE RUNNING THROUGH THE CENTER OF EACH BUILDING AND |
| | LABELED AS " 8 INCH PVC SCH. 40 FLOOR DRAIN" & "6 INCH |
| | PVC SCH. 40 FLOOR DRAIN" BUT NO FLOOR DRAINS ARE SHOWN. |
| | CLARIFY. SUBMIT A RISER DIAGRAM FOR THESE DRAINS AND |
| | SHOW THEM ON THE CIVIL DRAWINGS WHERE THEY EXIT THE |
| | BUILDING. FLOOR DRAINS SHALL BE EQUIPPED WITH TRAP |
| | PRIMERS. 2014 FBC-PLUMBING SEC.1002.4. WHAT WILL BE |
| | DISCHARGING INTO THESE LINES? CLARIFY. |
| | 10) SHT. 13 OF 13 - ADA ELEVATIONS - THE GRAB BAR |
| | BEHIND THE WATER CLOSET SHALL COMPLY WITH FBC-ACCESS. |
| | SEC.604.5.2 AND FIGURE 604.5.2. 2ND REQUEST. |
| | 11) NONE OF THE FIXTURES ARE VENTED ON THE SANITARY |
| | RISERS. COMPLY WITH 2014 FBC-PLUMBING SECS. 901.2, |
| | 901.2.1. |
| | 12) THERE IS A 2 INCH DRY VENT SHOWN ON THE SANITARY |
| | RISER. WHAT IS THIS VENT FOR? IT IS NOT TO CODE. COMPLY |
| | WITH 2014 FPC SEC. 905.3. |
| | 13) SHT. 5 OF 7 - SOUTH BUILDING - THE LOCATION OF THE |
| | CLEANOUT IN THE BUILDING SEWER ON THE WEST SIDE IS |
| | INSTALLED IN THE OPPOSITE DIRECTION OF FLOW AND WASTE |
| | WILL COLLECT IN THIS AREA AS DESIGNED. 2014 |
| | FBC-PLUMBING SEC. 708.5. |
| | 14) SHOW WATER SERVICE AND HOSE BIBS ON FLOOR PLAN. PER |
| | WPB AMEND TO FBC 107.2.1 |
| | 15) SHT.13 OF 13 SHOWS THE HEIGHT OF THE TOILET PAPER |
| | DISPENSER AS 4'-9" ABOVE THE FINISH FLOOR. THE HEIGHT |
| | OF THE TOILET PAPER DISPENSER SHALL COMPLY WITH 2014 |
| | FBC-ACCESS. SEC. 604.7. |
| | 16) SHT. 3 OF 13 & SHT. 4 OF 13 - DRINKING FOUNTAIN BY |
| | COLUMN LINE E-1 AND A-1 - SHOW THE REQUIRED CLEAR FLOOR |
| | SPACE FOR THE DRINKING FOUNTAIN AND CLEARLY SHOW THE |
| | DRINKING FOUNTAIN AND SUBMIT AN ELEVATION DETAIL OF THE |
| | DRINKING FOUNTAIN. ONE DRINKING FOUNTAIN SHALL CCOMPLY |
| | WITH 2014 FBC- ACCESS. SECS.602.1 THROUGH 602.6 AND ONE |
| | DRINKING FOUNTAIN SHALL COMPLY WITH 602.7 OR A SINGLE |
| | DRINKING FOUNTAIN SHALL COMPLY WITH SECS.602.1 THROUGH |
| | 602.6 AND 602.7. (HILO TYPE UNIT). |
| | 17) THE PLANS SHOW A LAVATORY IN THE TOILET ROOMS WITH |
| | A 24 INCH BY 24 INCH VANITY. THE VANITY DOES NOT COMPLY |
| | WITH 2014 FBC-SEC.606.2. SHOW THE REQUIRED CLEAR FLOOR |
| | SPACE FOR THE LAVATORY. THE LAVATORY SHALL BE |
| | POSITIONED FOR A FORWARD APPROACH. 2014 FBC - ACCESS. |
| | SEC,606.2. THE CLEAR FLOOR SPACE SHALL BE CENTERED ON |
| | THE FFIXTURE. |
| | 18) SHUTOFF VALVES ARE REQD. ON THE WATER RISER PER |
| | 2014 FBC-PLUMBING SEC.606.2. |
| | 19) HOSE BIBBS SHALL BE EQUIPPED WITH INDIVIDUAL |
| | SHUTOFF VALVES .2014 FBC-PLUMBING SEC..606.2 (2). |
| | 20) FULL OPEN VALVES SHALL BE INSTALLED ON THE WATER |
| | DISTRIBUTION SYSTEM PER 2014 FBC-PLUMBING SEC.606.1. |
| | 21) WHAT IS THE WALL AND FLOOR FINISH IN THE TOILET |
| | ROOMS? COMPLY WITH 2014 FBC-BUILDING SECS. 1210.2.1 |
| | THROUGH 1210.2.4. |
| | 22) SHTS. 3 & 4 OF 13 - THE WATER RISERS ONLY SHOW ONE |
| | DRINKING FOUNTAIN IN EACH BUILDING BUT THE FLOOR PLAN |
| | SHOWS TWO SEPARATE FOUNTAINS IN EACH BUILDING. CLARIFY. |
| | 23) THE SANITARY RISERS DO NOT COMPLY WITH 2014 |
| | FBC-PLUMBING SEC. 912.1 FOR FIXTURES PERMITTED ON A |
| | HORIZONTAL WET VENT. |
| | 24) CLEANOUTS ARE REQUIRED IN THE BASE OF THE STACKS. |
| | 2014 FBC-PLUMBING SEC.708.3.4. |
| | 25) AN EMERGENCY SHOWER/EYEWASH STATION (PORTABLE) |
| | SHOULD BE CONSIDERED DUE TO THE NATURE OF THE |
| | OPERATIONS. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |