| Date |
Text |
| 2016-11-20 03:17:02 | 3RD REVIEW |
| | PLUMBING COMMENTS: |
| | |
| | 1. SHOW THE WATER SERVICES AND SEWER LINES ON THE CIVIL |
| | DRAWING. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 2) THE OCCUPANCY IS NOTED AS AN F-2 ON THE PLANS. |
| | INDICATE ON BOTH SETS OF PLANS THE TYPE OF OPERATIONS |
| | THAT WILL BE CONDUCTED IN THIS FACILITY. WPB AMEND. TO |
| | FBC SEC. 107.2.1, 2014 FBC SEC. 302.1. |
| | 3) SHOW THE CLEAR INSIDE DIMENSIONS (LXW) OF BOTH |
| | ACCESSIBLE TOILET ROOMS ON THE PLANS. WPB AMEND. TO FBC |
| | SEC. 107.2.1. |
| | 4) SHOW THE REQUIRED CLEAR FLOOR SPACE FOR THE WATER |
| | CLOSET AND THE LAVATORY IN EACH TOILET ROOM. COMPLY |
| | WITH 2014 FBC-ACCESS. SECS.604.3.1 & 606. |
| | 5) PAGE 4 OF 13 HAS A NOTE THAT READS "RISER CAP AT |
| | FLOOR, 3 INCH STUB OUT FOR FUTURE BATHROOM." SUBMIT A |
| | SANITARY DIAGRAM FOR THIS FUTURE LINE ON THE PLANS AND |
| | THE TERMINATION POINT WHERE IT CONNECTS TO THE SEWER |
| | SYSTEM.WPB AMEND. TO FBC SEC. 107.2.1. |
| | 6) A MINIMUM OF TWO DRINKING FOUNTAINS ARE REQUIRED IN |
| | EACH BUILDING PER 2014 FPC TABLE 403.1 FOOTNOTE # E AND |
| | 2014 FBC-ACCESS. SEC. 211.2. |
| | 7) A SERVICE SINK IS REQUIRED IN EACH BUILDING PER |
| | TABLE 403.1 OF 2014 FPC. |
| | 8) PROVIDE A WATER RISER DIAGRAM FOR EACH BUILDING FOR |
| | REVIEW. WPB AMEND TO FBC 107.3.5.1.3 (11). |
| | 9) TOILET PAPER DISPENSERS SHALL COMPLY WITH |
| | FBC-ACCESS. SECS. 309.4 AND 604.7.AND SHALL BE 7 INCHES |
| | (180 MM) MINIMUM AND 9 INCHES (230 MM) MAXIMUM IN FRONT |
| | OF THE WATER CLOSET MEASURED TO THE CENTERLINE OF THE |
| | DISPENSER. THE OUTLET OF THE DISPENSER SHALL BE 15 |
| | INCHES (380 MM) MINIMUM AND 48 INCHES (1220 MM) MAXIMUM |
| | ABOVE THE FINISH FLOOR AND SHALL NOT BE LOCATED BEHIND |
| | GRAB BARS. |
| | 10) THE GRAB BAR BEHIND THE WATER CLOSET SHALL COMPLY |
| | WITH FBC-ACCESS. SEC.604.5.2 AND FIGURE 604.5.2. |
| | 11) SIZE ALL SECTIONS OF THE SANITARY RISER. |
| | 12) THERE IS A 2 INCH DRY VENT SHOWN ON THE SANITARY |
| | RISER. WHAT IS THIS VENT FOR? IT IS NOT TO CODE. COMPLY |
| | WITH 2014 FPC SEC. 905.3. |
| | 13) SHOW BUILDING DRAIN AND SEWER ON FLOOR PLAN. PER |
| | WPB AMEND TO FBC 107.2.1. |
| | 14) SHOW WATER SERVICE AND HOSE BIBS ON FLOOR PLAN. PER |
| | WPB AMEND TO FBC 107.2.1 |
| | 15) SHT.13 OF 13 SHOWS THE HEIGHT OF THE TOILET PAPER |
| | DISPENSER AS 4'-9" ABOVE THE FINISH FLOOR. THE HEIGHT |
| | OF THE TOILET PAPER DISPENSER SHALL COMPLY WITH 2014 |
| | FBC-ACCESS. SEC. 604.7. |
| | 16) A CLEANOUT SHALL BE INSTALLED AT THE JUNCTION OF |
| | THE BUILDING DRAIN AND THE BUILDING SEWER OF EACH |
| | BUILDING PER 2014 FPC SEC. 708.3.5. THIS WILL ALSO |
| | APPLY TO THE FUTURE LINE FOR THE SOUTH BUILDING. |
| | ANOTHER CLEANOUT BROUGHT TO GRADE SHALL BE INSTALLED |
| | WHERE THE BUILDING SEWER CONNECTS TO THE CITY LATERAL. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |