Text |
| 2016-08-15 15:31:55 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | 1. IT IS NOT CLEAR WHERE THE NEW UNNUMBERED STAIR |
| | DISCHARGES (SEE SECOND FLOOR PLAN, FIRST FLOOR PLAN). |
| | INTERIOR BUILDING PERMIT 16070715 INCLUDES DETAILS FOR |
| | STAIR 5, BUT THE DETAILS SHOW A WALL WITH A SINGLE DOOR |
| | EXIT DISCHARGE, AND THE STAIR IDENTIFICATION NUMBERS |
| | WERE REMOVED FROM THE PLAN ON THE LIFE SAFETY SHEETS |
| | (ON PERMIT 16070715 WHICH IS NOT BEING REVIEWED AT THIS |
| | TIME BUT WAS CHECKED FOR CLARIFICATION), FBC 107. |
| | |
| | IF A PROVISO IS NEGOTIATED WITH FIRE, PLEASE ADVISE. |
| | |
| | 2. AS301, LEVEL 1, THE ACCESSIBLE ROUTE FOR THE |
| | ACCESSIBLE VAN PARKING SPACE IS NOT CLEAR. I WAS UNABLE |
| | TO LOCATE A DOOR LEADING FROM THE GARAGE AREA TO THE |
| | WEST ELEVATORS TO ACCESS THE SALES MANAGEMENT AREA ON |
| | THE SECOND FLOOR, SEE FBC 5TH EDITION ACCESSIBILITY |
| | 208.2.4, 502.2. NOTE THAT IT APPEARS THAT THE REQUIRED |
| | NUMBER OF VAN PARKING SPACES MAY BE EXCEEDED. |
| | |
| | 3. SHEET AS212A, DOORS TO LOBBY FROM POOL AREA SWING |
| | AGAINST PATH OF TRAVEL, FBC 1008.1.2. THIS WAS CORRECT |
| | IN THE FIRST REVIEW, REVISED IN THE SECOND REVIEW BUT |
| | NOT CLOUDED. PLEASE BE ADVISED THAT, IN GENERAL, ONLY |
| | CLOUDED CHANGES ARE REVIEWED. |
| | |
| | 4. ADVISORY; SHEET AS203, THE SOUTH ACCESSIBLE PARKING |
| | SPACE (GRIDLINE G4) REQUIRES THE OCCUPANT TO TRAVEL |
| | BEHIND THE VAN PARKING SPACE TO ACCESS THE LOBBY, AVIS, |
| | AND RESIDENTIAL LOBBY. THIS WILL BE REQUIRED TO BE |
| | CORRECTED ON THE BUILDING PERMIT. |
| | |
| | 5. THIS PERMIT WILL BE ISSUED WITH THE FOLLOWING |
| | PROVISOS: |
| | |
| | A. PROVISO: TCO AT EACH PHASE IS SUBJECT TO APPROVAL OF |
| | THE BUILDING OFFICIAL (OR HIS REPRESENTATIVE) AND FIRE |
| | DEPARTMENT, AND MAY INCLUDE ITEMS NOT WITHIN THE SCOPE |
| | OF THIS REVIEW. |
| | |
| | A TCO REQUEST FORM AND FEE WILL BE REQUIRED. THIS FORM |
| | IS AVAILABLE UPON REQUEST BY EMAIL. |
| | |
| | B. PROVISO, LIFE SAFETY PLANS REFER TO LIFE SAFETY |
| | SYSTEMS DETAILED ON FMEP SHEETS (LIFE SAFETY TCO NOTES) |
| | WHICH HAVE NOT BEEN PROVIDED AT THIS TIME. COMPLIANCE |
| | WITH ALL LIFE SAFETY AND ACCESSIBILITY REQUIREMENTS IS |
| | REQUIRED FOR EACH PHASE. FMEP SHEETS AND LIFE SAFETY |
| | SYSTEM SPECIFICS WILL BE REVIEWED AT TIME OF INTERIOR |
| | BUILDOUT PERMIT APPLICATION. |
| | |
| | C. PROVISO, PERMIT WILL BE ISSUED AT CONTRACTOR'S RISK. |
| | FBC105.13 PHASED PERMIT APPROVAL. AFTER SUBMITTAL OF |
| | THE APPROPRIATE CONSTRUCTION DOCUMENTS, THE BUILDING |
| | OFFICIAL IS AUTHORIZED TO ISSUE A PERMIT FOR THE |
| | CONSTRUCTION OF FOUNDATIONS OR ANY OTHER PART OF A |
| | BUILDING OR STRUCTURE BEFORE THE CONSTRUCTION DOCUMENTS |
| | FOR THE WHOLE BUILDING OR STRUCTURE HAVE BEEN |
| | SUBMITTED. THE HOLDER OF SUCH PERMIT FOR THE FOUNDATION |
| | OR OTHER PARTS OF A BUILDING OR STRUCTURE SHALL PROCEED |
| | AT THE HOLDER 'S OWN RISK WITH THE BUILDING OPERATION |
| | AND WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE |
| | STRUCTURE WILL BE GRANTED. CORRECTIONS MAY BE REQUIRED |
| | TO MEET THE REQUIREMENTS OF THE TECHNICAL CODES. THIS |
| | PROVISION IS ONLY FOR THE FLORIDA BUILDING CODE, ALL |
| | OTHER AGENCY APPROVALS NECESSARY FOR CONSTRUCTION MUST |
| | BE SECURED PRIOR TO THIS PROVISION BEING APPLIED. |
| | |
| | D. INFORMATIONAL ONLY, A CURSORY REVIEW HAS BEEN |
| | PERFORMED ON THE LIFE SAFETY PLAN AND ACCESSIBILITY. |
| | DIMENSIONS, DOOR TYPES, HARDWARE SCHEDULE, ETC. IS |
| | REQUIRED FOR A COMPREHENSIVE REVIEW WHICH WILL BE |
| | PERFORMED AT TIME OF INTERIOR BUILDOUT PERMIT REVIEW. |
| | |
| | E. PROVISO, THIS STUCTURE SERVES A BUILDING WHICH HAS |
| | NOT BEEN REVIEWED BY THIS DEPARTMENT (TRAIN STATION). |
| | ACCESSIBLE ROUTE IN COMPLIANCE WITH FBC 5TH EDITION |
| | ACCESSIBILITY IS REQUIRED AND WILL BE VERIFIED IN THE |
| | FIELD. |
| | |
| | |