| Plan Review Notes For Permit 16040632 |
| Permit Number |
16040632 |
|
| Review Stop |
M |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2016-06-23 14:16:32 | 2ND REVIEW: FBC 2014 MECHANICAL | | | PERMIT #16040632 | | | 6/23/16 | | | | | | 1) REFER TO SECTION 406.8.2 FBC-14 BUILDING: THE | | | EXHAUST FANS FOR THE SERVICE GARAGE SHALL BE CONTROLLED | | | AT THE ENTRANCE TO THE GARAGE. | | | | | | 2) PLEASE INCLUDE AN EXHAUST VENTILATION CALCULATION | | | FOR THE PARTS DELIVERY GARAGE AT .75 CFM'S PER SF. AS | | | INDICATED IN TABLE 403.3. EF-3 AT 70 CFM'S APPEARS | | | UNDERSIZED IN CAPACITY. | | | | | | 3) INDICATE HOW THE AIR AND OIL STORAGE GARAGE IS TO BE | | | VENTILATED PER SECTION 401.2. | | | | | | 4) SHEET M0.1 SHOWN IN THE INDEX IS NOT INCLUDED IN THE | | | PLAN SETS, AND SHEET M2.2 IS NOT IN THE INDEX. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|