| Date |
Text |
| 2016-06-02 12:21:32 | 2ND REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #16040583 |
| | 6/2/16 |
| | |
| | 1) SUBMIT AC CHANGEOUT FORMS AND AHRI CERTIFICATES FOR |
| | THE SYSTEMS BEING REPLACED AS INDICATED ON SHEET M-2. |
| | |
| | 2) THE SCOPE OF WORK FOR MECHANICAL IS NOT CLEAR: THE |
| | 1ST FLOOR AND MEZZANINE DUCT LAYOUT PLANS ON M-1 ARE |
| | LABELED AS "EXISTING", HOWEVER THE HVAC NOTES ON M-2 |
| | APPEAR TO INDICATE ALL NEW DUCT WORK, EXHAUST FANS, AND |
| | OTHER COMPONENTS. PLEASE CLARIFY AND USE LETTERED |
| | SYMBOLS SUCH AS "E" FOR EXISTING, "N" FOR NEW, "R" FOR |
| | RELOCATED AT DIFFUSER AND GRILL LOCATIONS, USE DOTTED |
| | LINES TO INDICATE REMOVED OR RELOCATED DUCTS AND SOLID |
| | LINES TO INDICATE NEW, REPLACED, OR RELOCATED DUCTS. IN |
| | REGARD TO THE EXISTING PLANS PLEASE REVIEW THESE |
| | COMMENTS: |
| | |
| | A) LABEL THE 8X6 DUCT IN THE OFFICE 108 AND THE CFMS. |
| | B) PROVIDE EXHAUST VENTILATION CALCULATIONS FOR THE |
| | OPEN AREA SHOWN ON THE 1ST FLOOR, CLARIFY WHY EXHAUST |
| | IS NEEDED (WHAT PROCESSES OR WORK IS BEING CONDUCTED IN |
| | THE ROOM?), AND LABEL THE EXHAUST DUCT TERMINATION |
| | LOCATION. |
| | C) PROVIDE WIND LOAD DEIGN CRITERIA AND ENGINEERED |
| | DETAILS FOR INSTALLATION OF THE NEW ROOF TOP CONDENSER |
| | AND CONDENSER STANDS, AND EXHAUST TERMINATION CAPS- |
| | SECTION 301.15. |
| | D) THE TOILET ROOM EXHAUST FANS SHALL HAVE CAPACITIES |
| | OF 70 CFMS EACH PER TABLE 403.3 FBC-14 MECHANICAL. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |