| Date |
Text |
| 2016-04-13 15:01:44 | 1ST REVIEW: FBC 2014 5TH ED |
| | CHRISTOPHER S. THROOP, C.B.O. |
| | BLDG. PLANS EXAMINER ? PX3169 |
| | (561) 805-6718 |
| | [email protected] |
| | |
| | 1. OWNER TO SIGN APPLICATION. |
| | 2. DESIGN PROFESSIONAL TO SIGN DRAWINGS. |
| | 3. IDENTIFY CURRENT GOVERNING CODES ON PLANS. |
| | 4. BUILDING OCCUPANCY IS I-1 INSTITUTIONAL. BUILDING IS |
| | TYPE IIB SPRINKLERED. |
| | 5. PROVIDE DETAIL ON RE-LOCATION OF FIRE SPRINKLER |
| | HEADS. DEMONSTRATE HOW REQUIRED COVERAGE WILL BE |
| | MAINTAINED. |
| | 6, FIRE PERMIT REQUIRED. |
| | 7. PROVIDE DETAIL ON ANY ABOVE CEILING ELECTRICAL WORK. |
| | 8. ELECTRICAL PERMIT REQUIRED. |
| | 9. IDENTIFY AND LABEL ANY WATER LINES AND VALVES ABOVE |
| | CEILING. |
| | 10. PLUMBING PERMIT REQUIRED. |
| | 11. IDENTIFY AND LABEL ANY HVAC DAMPERS ABOVE CEILING. |
| | 12. HVAC PERMIT REQUIRED. |
| | 13. STENCIL "RATED WALL" ABOVE CEILING PER CODE |
| | REQUIREMENTS. |
| | 14. PROVIDE DETAIL ON REPAIR OF ANY PENETRATIONS IN |
| | RATED ASSEMBLIES ABOVE CEILING PRIOR TO CONCEALMENT. |
| | 15. PROVIDE CERTIFICATE OF SURFACE BURNING |
| | CHARACTERISTICS OF BUILDING MATERIALS FOR PROPOSED |
| | CEILING TILES PER ASTM E 84-11A. |
| | 16. RE-EVALUATE STATED VALUE ON PERMIT APPLICATION. |
| | 17. DUE TO EXISTING VIOLATIONS, FIELD INSPECTORS MAY |
| | REQUIRE ADDITIONAL INSPECTIONS. |
| | 18. PROVIDE DETAIL OF DROP CEILING HEIGHT AFF ON PLANS. |
| | EMERGENCY EXIT LIGHTS MAY HAVE TO BE LOW PROFILE. |
| | |
| | FBC 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | CONSTRUCTION DOCUMENTS SHALL BE |
| | DIMENSIONED AND DRAWN UPON SUITABLE MATERIAL. |
| | CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT CLARITY |
| | TO INDICATE THE LOCATION, NATURE AND EXTENT OF THE WORK |
| | PROPOSED AND SHOW IN DETAIL THAT IT WILL CONFORM TO THE |
| | PROVISIONS OF THIS CODE AND RELEVANT LAWS, ORDINANCES, |
| | RULES AND REGULATIONS, AS DETERMINED BY THE BUILDING |
| | OFFICIAL. SUCH DRAWINGS AND SPECIFICATIONS SHALL |
| | CONTAIN INFORMATION, IN THE FORM OF NOTES OR OTHERWISE, |
| | AS TO THE QUALITY OF MATERIALS, WHERE QUALITY IS |
| | ESSENTIAL TO CONFORMITY WITH THE TECHNICAL CODES. SUCH |
| | INFORMATION SHALL BE SPECIFIC, AND THE TECHNICAL CODES |
| | SHALL NOT BE CITED AS A WHOLE OR IN PART, NOR SHALL THE |
| | TERM "LEGAL" OR ITS EQUIVALENT BE USED AS A SUBSTITUTE |
| | FOR SPECIFIC INFORMATION. ALL INFORMATION, DRAWINGS, |
| | SPECIFICATIONS AND ACCOMPANYING DATA SHALL BEAR THE |
| | NAME AND SIGNATURE OF THE PERSON RESPONSIBLE FOR THE |
| | DESIGN. (SEE ALSO SECTION 107.3.5). |
| | |
| | FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING |
| | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE |
| | TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | FAILURE TO PROVIDE DOCUMENTATION OF ESTIMATED COSTS MAY |
| | DELAY THE APPLICATION PROCESS. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND LEAVE THE |
| | PREVIOUSLY REVIEWED SHEETS DETACHED. |
| | |
| | |
| | |
| | |