| 2016-04-13 12:17:51 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #16040429 |
| | 4/13/16 |
| | |
| | 1) SHEET M1: THE VENTILATION FAN SCHEDULE INDICATES 560 |
| | CFM CAPACITIES FOR TEF-1, AND EF-1: PLEASE CORRECT, AND |
| | INCLUDE THE CFM CAPACITY OF THE TEF-1 INTO THE AIR |
| | BALANCE CALCULATION AND SCHEDULE. |
| | 2 ) PROVIDE A MECHANICAL ROOF PLAN INDICATING EQUIPMENT |
| | LOCATIONS, AND CLEARANCE DISTANCE MEASUREMENTS FOR AIR |
| | INTAKES AS REQUIRED IN SECTION 401.6, AND EXHAUST |
| | OUTLET TERMINATIONS AS REQUIRED IN SECTIONS 501.3.1 AND |
| | 506.4.2 (TYPE II TERMINATIONS). PLEASE NOTE THAT THE |
| | HOOD EXHAUST OUTLET SHALL TERMINATE NOT LESS THAN 30 |
| | INCHES ABOVE THE ROOF SURFACE (TO BE ADDRESSED UNDER |
| | HOOD PERMIT PLANS). |
| | 3) REFER TO SECTIONS 304.11 FOR REQUIRED GUARDS AT ROOF |
| | EDGE IF NECESSARY, AND SECTION 306.5 FOR PERMANENT ROOF |
| | LADDER REQUIERMENTS IF NECESSARY AND NO COMPLIANT MEANS |
| | OF ACCESS EXISTS. |
| | 3) SEPARATE PERMITS ARE REQUIRED FOR THE HOOD AND THE |
| | WALK-IN COOLER. PLEASE PLACE A NOTE ON THE PLANS TO |
| | CLARIFY AND PROVIDE DIRECTION. |
| | 4) SHEET M3: PROVIDE THE WIND LOAD DESIGN CRITERIA ON |
| | THE PLANS FOR ANCHORAGE OF THE RTU, CURBS, AND FANS TO |
| | THE ROOF STRUCTURE- SEE SECTIONS 301.15 FBC-14 |
| | MECHANCIAL, AND SECTION 1609 FBC-14 BUILDING. PLEASE |
| | PROVIDE COMPLETE DETAILS FOR INSTALLATION OF THE ROOF |
| | TOP FANS INCLUDING THE TYPE AND SIZE OF FASTENERS FOR |
| | MOUNTING THE CURBS TO THE STRUCTURE, AND THE FANS TO |
| | THE CURBS, |
| | 5) REFER TO SECTION 508.1.1 AND INDICATE COMPLIANCE FOR |
| | MAKEUP AIR TEMPERATURE FOR THE PROPOSED HOOD SYSTEM (TO |
| | BE ADDRESSED UNDER HOOD PERMIT PLANS). |
| | THE TEMPERATURE DIFFERENTIAL BETWEEN MAKEUP AIR AND THE |
| | AIR IN THE CONDITIONED SPACE SHALL NOT EXCEED 10?F |
| | (6?C) EXCEPT WHERE THE ADDED HEATING AND COOLING LOADS |
| | OF THE MAKEUP AIR DO NOT EXCEED THE CAPACITY OF THE |
| | HVAC SYSTEM. |
| | 6) PROVIDE A CONDENSATE DISPOSAL PLAN FOR THE NEW RTU- |
| | TYPE AND SIZE OF CONDENSATE PIPING, PIPING RUN AND |
| | DISCHARGE LOCATION, PIPING PRIOTECTION FROM UV |
| | DEGRADATION- SEE SECTION 307. |
| | 7) THE $15,000 JOB VALUE LISTED ON THE APPLICATION |
| | APPEARS TOO LOW FOR THE SCOPE OF THE PROJECT. PLEASE |
| | PROVIDE AN ACCURATE VALUE BASED ON COSTS FOR LABOR, |
| | MATERIALS, EQUIPMENT, FIXTURES, AND DESIGN FEES- |
| | SECTION 109.3 WPB AMENDMENTS TO THE FLORIDA BUILDING |
| | CODE. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |