| Date |
Text |
| 2016-12-02 10:48:56 | 3RD REVIEW FBC-2014 MECHANICAL |
| | PERMIT #16040415 |
| | 12/2/16 |
| | |
| | 1) SHEETS M-1 & M-2.1: IT APPEARS THAT THE RTU |
| | SCHEDULE, AND THE ENERGY AND AC CALCULATIONS ARE |
| | INDICATING NEW UNITS ARE BEING INSTALLED. PLEASE |
| | CORRECT THE MECHANICAL ROOF PLAN INDICATING EXISTING. |
| | |
| | 2) CLARIFY IF THE DUCT HEATERS ARE NEW OR EXISTING AND |
| | LABEL THEM ACCORDINGLY. IF NEW UNITS ARE BEING |
| | PROVIDED, PLEASE PROVIDE AN EQUIPMENT SCHEDULE. |
| | |
| | 3) M-1, FAN SCHEDULE: PROVIDE THE CONTROL SEQUENCE FOR |
| | EF-7. |
| | |
| | 4) M-1 & M-2.0A: THE EXHAUST CALCULATION IS SPECIFYING |
| | EXHAUST RATES BASED ON SECTION 502.8.1.1 FBC-14 |
| | MECHANICAL. PLEASE REVIEW AND SHOW COMPLIANCE WITH |
| | ITEMS #1-7 UNDER 502.8.1.1, AND ALSO REFER TO SECTION |
| | 510.8 FOR EXHAUST DUCT REQUIREMENTS AND SHOW DETAILS ON |
| | THE PLAN. |
| | |
| | 5) PLEASE REFER TO TABLE 7-1 ASHRAE 170- 2008 AND |
| | PROVIDE THE DESIGN PARAMETERS FOR THE SOILED UITILITY |
| | AND MEDICAL WASTE ROOMS. SHOW PRESSURE RELATIONSHIPS |
| | AND REQUIRED OUTDOOR AND TOTAL AIR CHANGES RO EACH |
| | ROOM. |
| | |
| | 6) PROVIDE AIR BALANCE CALCULATIONS THAT INCLUDE THE |
| | NEW EXHAUST VENTILATION SYSTEMS. |
| | |
| | 7) 2ND REQUEST FOR THE DEFINITION OF "HT" STORAGE ROOM |
| | AND WHAT MATERIALS ARE BEING STORED IN THE ROOM. AS |
| | PREVIOUSLY NOTED EXHAUST VENTILATION MAY BE REQUIRED |
| | AND RECIRCULATION IOF AIR PROHIBITED. |
| | |
| | 8) M2.0A: SHOW THE DUCT DROP AND DUCT PLAN FOR OAU-1. |
| | |
| | 9) M2.0A: THERE APPEARS TO BE A MISSING FIRE DAMPER |
| | WHERE THE 8X6 DUCT IS PENETRATING THE FIRE-RATED PD |
| | RECORDS ROOM WALL. |
| | |
| | 10 ) A RESPONSE NARRATIVE WAS NOT SUBMITTED WITH THE |
| | CORRECTED PLANS. PLEASE PROVIDE A RESPONSE NARRATIVE |
| | ADDRESSING THESE REVIEW COMMENTS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |