| 2016-08-04 14:44:28 | 2ND REVIEW FBC-2014 MECHANICAL |
| | PERMIT #16040412 |
| | 8/4/16 |
| | |
| | 1) AS PREVIOUSLY REQUESTED IN THE 1ST REVIEW: A) |
| | PROVIDE EXHAUST VENTILATION CALCULATIONS FOR THE SOILED |
| | UTILITY, MED WASTE, AND LAB ROOMS. B) PROVIDE AN |
| | EXHAUST SYSTEM IN THE LAB ROOM PER TABLE 403.3 AND |
| | ASHRAE 62.1-2010. PLEASE NOTE THAT RECIRCULATION OF AIR |
| | FROM THE SPACE IS PROHIBITED PER TABLE 403.3 FOOTNOTE G |
| | |
| | 2) DEFINE "HT" AS IT APPLIES TO THE HT STORAGE ROOM. |
| | INDICATE WHAT MATERIALS AND/OR EQUIPMENT ARE BEING |
| | STORED IN THE ROOM. PLEASE NOTE THAT EXHAUST |
| | VENTILATIONS MAY BE REQUIRED. |
| | |
| | 3) M-3.1: AS PREVIOUSLY REQUESTED PROVIDE COMPLETE |
| | ENGINEERED DETAILS FOR MOUNTING THE NEW RTU'S TO THE |
| | CURBS- SECTION 301.15. PLEASE INCLUDE THE WIND LOAD |
| | DESIGN CRITERIA FOR THE INSTALLATIONS AS OUTLINED IN |
| | SECTION 1609 FBC-14 BUILDING. CONTRARY TO THE RESPONSE |
| | NARRATIVE FROM JMM ENGINEERS, RTU'S 5, 6, 7, 8, &9 ARE |
| | NOT EXISTING AND WERE NEVER PERMITTED. BUILDING |
| | DEPARTMENT RECORDS INDICATE PERMIT #15070429 WAS ISSUED |
| | FOR INSTALLATION OF THE CURBS ONLY WITH CAPPING FOR |
| | FUTURE USE. WIND LOAD ENGINEERING IS ALSO REQUIRED |
| | INSTALLATION OF THE ROOFTOP FANS AND CURBS- EF-1, 2, 3, |
| | 4, 5, & 6. |
| | |
| | 4) SHEET M-2.1: AS PREVIOSULY REQUESTED, PROVIDE THE |
| | CLEARANCE DISTANCE MEASURERMENTS FROM THE EXHAUST FANS |
| | TO THE ROOF EDGES. ARE THERE PARAPETS THAT EXTEND AT |
| | LEAST 42" ABOVE THE FINISHED ROOF SURFACE? |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |