| Plan Review Notes For Permit 16040227 |
| Permit Number |
16040227 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-04-07 04:54:41 | 1) IS THIS AN EXACT REPLACEMENT OF AN EXISTING BOILER | | | OR IS THIS BEING ADDED? THE APPLICATION STATES "SUPPLY | | | AND INSTALL "NEW" GAS BOILER. CLARIFY. IF IT IS AN | | | EXACT REPLACEMENT, NOTE SUCH ON THE APPLICATION. | | | 2) WILL THE BOILER BE CONNECTED TO AN EXISTING VENT OR | | | WILL A NEW VENT BE INSTALLED? IF A NEW VENT IS TO BE | | | INSTALLED, SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, | | | SIZE AND TERMINATION OF THE GAS VENTS PER 2014 FBC-FUEL | | | GAS SECS. 502 THRU 505. | | | 3) WILL ANY GAS PIPING OR WATER/BOILER PIPING HAVE TO | | | BE ALTERED OR CHANGED? IF SO, SUBMIT A PIPING RISER FOR | | | THE CHANGES THAT WILL BE MADE TO THE GAS AND WATER | | | SYSTEMS. | | | 4) SUBMIT TWO COPIES OF DOCUMENTATION THAT THE BOILER | | | IS LISTED IN ACCORDANCE WITH THE STANDARDS ANSI Z21.13 | | | OR UL 795 PER THE 2014 FGC SEC.631.1 AND IF APPLICABLE, | | | THE ADDITIONAL STANDARDS LISTED IN THE FGC SEC. 631.1. | | | 5) SUBMIT TWO COPIES OF THE MANUFACTURER'S INSTALLATION | | | INSTRUCTIONS. 2014 FBC 107.1, 2014 FGC SEC.631.2. | | | 6) CLEARANCE TO CCOMBUSTIBLE MATERIALS SHALL COMPLY | | | WITH FGC SEC.631.3 & 308.4 OF 2015 FGC. | | | 7) CLEARANCES FROM THE TOPS OF BOILERS TO THE CEILING | | | OR OTHER OVERHEAD OBSTRUCTION SHALL BE IN ACCORDANCE | | | WITH 2014 FBC-MECHANICAL SEC.1004.3.1 & TABLE 1004.3.1. | | | 8) SUBMIT A FLOOR PLAN THAT REFLECTS THE ABOVE | | | CONDITIONS. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | |
|