| 2016-04-11 16:34:12 | 1ST REVIEW: FBC 2014 MECHANICAL, ENERGY CONSERVATION |
| | PERMIT #16040056 |
| | 4/11/16 |
| | |
| | 1) PROVIDE AC COOLING AND HEATING CALCULATIONS FOR THE |
| | NEW CARRIER SYSTEM- SECTION C403.2.1 FBC-14 ENERGY |
| | CONSERVATION. |
| | 2) THE ENERGY CONSERVATION FORM DOES NOT LIST DATA FOR |
| | THE AC SYSTEM IN THE COMPLIANCE SUMMARY: IT IS ONLY |
| | FOUND IN THE INPUT DATA REPORT. A) PLEASE REVIEW AND |
| | REVISE THE MANDATORY REQUIREMENTS CHECKLIST BEGINNING |
| | ON PAGE 8 OF THE FORM- MANY OF THE BOXES CHECKED OFF |
| | ARE NOT APPLICABLE TO THIS PROJECT. |
| | 3) REFER TO TABLE 403.3 FBC-14 MECHANICAL: THE EXHAUST |
| | RATE FOR BEAUTY SALONS IS 0.6 CFM PER SF, AND THE AIR |
| | CANNOT BE RECIRCULATED PER FOOTNOTE B. IT APPEARS THAT |
| | EF-3 AND EF-4 DO NOT HAVE THE CAPACITIES TO MEET THE |
| | REQUIREMENT. PLEASE SEE SECTION 501.4 AND INDICATE HOW |
| | MAKE-UP AIR FOR THE EXHAUST WILL BE PROVIDED, AND |
| | PROVIDE BOTH EXHAUST VENTILATION AND AIR BALANCE |
| | CALCULATIONS. |
| | 4) SHEET AC-1: REFER TO SECTION C403.2.7.2 FBC-14 |
| | ENERGY CONSERVATION AND REMOVE THE 3/4" CDX PLYWOOD AHU |
| | PLATFORM IN THE CLOSET- SEE AIR CONDITIONING NOTE #15 |
| | ON SHEET AC-1. |
| | 5) AC-1: INDICATE HOW THE EXTERIOR DOOR FOR THE AC |
| | CLOSET WILL BE AIR SEALED TO MEET COMPLIANCE WITH |
| | SECTION C403.2.7.3 FBC-14 ENERGY CONSERVATION. |
| | 6) AC-1: VERIFY THE LOCATION OF THE O/A INTAKE IS IN |
| | COMPLIANCE WITH SECTION 401.4 FOR REQUIRED CLEARANCES. |
| | 7) AC-1: TYPICALLY, OUTSIDE AIR MAKES UP APPROXIMATELY |
| | 15-20% OF THE SUPPLY AIR OF AN AC SYSTEM, HOWEVER THE |
| | 360 CFMS IS APPROXIMATELY 25% OF THE NEW AC SYSTEM. SEE |
| | COMMENT #1 ABOVE AND PROVIDE AC CALCULATIONS. |
| | 8) AC-1: THE 14X12 MAIN TRUNK TO THE SECOND FLOOR IS |
| | UNDERSIZED FOR 1035 CFMS- PLEASE INCREASE TO 14X16. |
| | 8) AC-1: INDICATE THE TOTAL RUN LENGTH OF THE DRYER |
| | EXHAUST DUCT AND THE METAL GAGE OF THE DUCT- SEE |
| | SECTION 504. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR |
| | THE DRYER REVIEWED AND APPROVED BY THE DESIGN |
| | PROFESSIONAL. |
| | 9) AC-1: REMOVE THE VD NOTE BY THE AIR HANDLER AND |
| | REPLACE WITH MD (MOTORIZED DAMPER) AS INDICATED IN NOTE |
| | 2 OF THE AC CONTROL SEQUENCE. |
| | 10) AC-1: VERIFY THE LOCATIONS OF THE EXHAUST |
| | TERMINATIONS ARE IN COMPLIANCE WITH SECTION 501.3.1(3) |
| | FBC-14 MECHANICAL. |
| | 11) PROVIDE PRIMARY AND SECONDARY CONDENSATE DISPOSAL |
| | PLANS PER SECTION 307 |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |