2016-04-11 16:34:121ST REVIEW: FBC 2014 MECHANICAL, ENERGY CONSERVATION
 PERMIT #16040056
 4/11/16
  
 1) PROVIDE AC COOLING AND HEATING CALCULATIONS FOR THE
 NEW CARRIER SYSTEM- SECTION C403.2.1 FBC-14 ENERGY
 CONSERVATION.
 2) THE ENERGY CONSERVATION FORM DOES NOT LIST DATA FOR
 THE AC SYSTEM IN THE COMPLIANCE SUMMARY: IT IS ONLY
 FOUND IN THE INPUT DATA REPORT. A) PLEASE REVIEW AND
 REVISE THE MANDATORY REQUIREMENTS CHECKLIST BEGINNING
 ON PAGE 8 OF THE FORM- MANY OF THE BOXES CHECKED OFF
 ARE NOT APPLICABLE TO THIS PROJECT.
 3) REFER TO TABLE 403.3 FBC-14 MECHANICAL: THE EXHAUST
 RATE FOR BEAUTY SALONS IS 0.6 CFM PER SF, AND THE AIR
 CANNOT BE RECIRCULATED PER FOOTNOTE B. IT APPEARS THAT
 EF-3 AND EF-4 DO NOT HAVE THE CAPACITIES TO MEET THE
 REQUIREMENT. PLEASE SEE SECTION 501.4 AND INDICATE HOW
 MAKE-UP AIR FOR THE EXHAUST WILL BE PROVIDED, AND
 PROVIDE BOTH EXHAUST VENTILATION AND AIR BALANCE
 CALCULATIONS.
 4) SHEET AC-1: REFER TO SECTION C403.2.7.2 FBC-14
 ENERGY CONSERVATION AND REMOVE THE 3/4" CDX PLYWOOD AHU
 PLATFORM IN THE CLOSET- SEE AIR CONDITIONING NOTE #15
 ON SHEET AC-1.
 5) AC-1: INDICATE HOW THE EXTERIOR DOOR FOR THE AC
 CLOSET WILL BE AIR SEALED TO MEET COMPLIANCE WITH
 SECTION C403.2.7.3 FBC-14 ENERGY CONSERVATION.
 6) AC-1: VERIFY THE LOCATION OF THE O/A INTAKE IS IN
 COMPLIANCE WITH SECTION 401.4 FOR REQUIRED CLEARANCES.
 7) AC-1: TYPICALLY, OUTSIDE AIR MAKES UP APPROXIMATELY
 15-20% OF THE SUPPLY AIR OF AN AC SYSTEM, HOWEVER THE
 360 CFMS IS APPROXIMATELY 25% OF THE NEW AC SYSTEM. SEE
 COMMENT #1 ABOVE AND PROVIDE AC CALCULATIONS.
 8) AC-1: THE 14X12 MAIN TRUNK TO THE SECOND FLOOR IS
 UNDERSIZED FOR 1035 CFMS- PLEASE INCREASE TO 14X16.
 8) AC-1: INDICATE THE TOTAL RUN LENGTH OF THE DRYER
 EXHAUST DUCT AND THE METAL GAGE OF THE DUCT- SEE
 SECTION 504. SUBMIT MANUFACTURER'S SPECIFICATIONS FOR
 THE DRYER REVIEWED AND APPROVED BY THE DESIGN
 PROFESSIONAL.
 9) AC-1: REMOVE THE VD NOTE BY THE AIR HANDLER AND
 REPLACE WITH MD (MOTORIZED DAMPER) AS INDICATED IN NOTE
 2 OF THE AC CONTROL SEQUENCE.
 10) AC-1: VERIFY THE LOCATIONS OF THE EXHAUST
 TERMINATIONS ARE IN COMPLIANCE WITH SECTION 501.3.1(3)
 FBC-14 MECHANICAL.
 11) PROVIDE PRIMARY AND SECONDARY CONDENSATE DISPOSAL
 PLANS PER SECTION 307
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER