| Plan Review Notes For Permit 16031201 |
| Permit Number |
16031201 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-03-26 08:34:07 | 1) CLEARLY SHOW THE DEVELOPED LENGTH AND THE BTU LOAD | | | OF THE 2 PSI SYSTEM ON THE GAS DRAWING. THE TOP OF THE | | | DRAWING IS CUT OFF AND THE INFORMATION IS NOT CLEAR. | | | FBC 107.2.1. | | | 2) CLEARLY IDENTIFY/LABEL THE STEP DOWN REGULATORS ON | | | THE GAS DRAWING. | | | 3) EXPLAIN WHAT THE LETTERS "A" & "B" ON THE GAS | | | DRAWING ARE FOR. | | | 4) INDICATE THE PIPE MATERIAL FOR THE 2 PSI 3/4" LINE | | | FROM THE PE PIPE TO THE FUTURE SKILLET & THE FUTURE | | | OVEN.IS THIS ALSO PE PIPE? | | | | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|