| Plan Review Notes For Permit 16031119 |
| Permit Number |
16031119 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-05-09 17:24:02 | 1ST REVIEW: FBC 2014 | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] | | | | | | 1. SHOW TYPE OF PIPING MATERIAL BEING INSTALLED, ALL | | | PIPE SIZES, AND THE EHD NUMBER OF CORRUGATED STAINLESS | | | STEEL TUBING FOR EACH PIPE SIZE IF BEING USED. WPB | | | AMENDMENTS TO FBC SEC. 107.2.1. | | | | | | | | | 2. SHOW BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU | | | LOAD ON THE SYSTEM. REFER TO THE FBC-2014 FUEL GAS | | | SECS. 401.8 THRU 402.6.1 AND TABLES 402.4(1) THRU | | | 402.4(37). | | | | | | 3.SHOW THE DISTANCE FROM THE POINT OF DELIVERY, | | | (METER), TO THE MOST REMOTE OUTLET IN THE BUILDING | | | AND/OR SYSTEM PER THE FBC-2014 FUEL GAS APPENDIX A ? | | | USE OF CAPACITY SECTION A.3.1(4) & 2014 FUEL GAS CODE | | | SEC. 402.4.1 | | | | | | 4.SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL | | | GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA | | | 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2 | | | | | | | | | 5.INDICATE THE DELIVERY PRESSURE (PSI) PER FBC-2014 | | | FUEL GAS SEC. 402.2. IF NATURAL GAS SPECIFY .5 PSI OR 2 | | | PSI. | | | | | | 6.SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL | | | CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER | | | FBC-2014 FUEL GAS, SECS. 402.4.1, 402.4 | | | | | | |
|