| Date |
Text |
| 2016-04-18 06:32:55 | 1) SHT. LS.01 - THE OCCUPANCY OF THIS SPACE IS NOTED AS |
| | "MERCHANT" & "M" AND THE WORD "ASSEMBLY" IS HANDWRITTEN |
| | IN. ALSO, SHT. A.01 LISTS THE OCCUPANCY AS A-2.CLARIFY |
| | THE OCCCUPANCY OF THIS SPACE PER 2014 FBC SEC.302. |
| | 2) SUBMIT THE CORRECT OCCUPANT LOAD FOR THE SPACE. IT |
| | APPEARS AS THOUGH THE OCCUPANT LOAD WILL EXCEED 50 |
| | PERSONS. |
| | 3) THE GRAB BARS SHALL BE MEASURED TO THE TOP OF THE |
| | GRIPPING SURFACE PER 2014 FBC - ACCESSIBILITY SEC. |
| | 609.4. |
| | 4) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE UNDER |
| | THE SINK GREASE TRAP AND SUBMIT SIZING CALCULATIONS PER |
| | THE FPC SEC.1003.2, 1003.3.4. |
| | 5) SHT. P.01 - AS DRAWN, THE URINAL IN THE MEN'S |
| | RESTROOM IS ON A WET VENT.ONLY THE FIXTURES IN A |
| | BATHROOM GROUP ARE PERMITTED ON A WET VENT PER THE 2014 |
| | FPC SEC.912.1 ( REFER TO THE DEFINITION OF "BATHROOM |
| | GROUP" IN THE DEFINITIONS OF THE FPC.) |
| | 6) SUBMIT AN EXPANDED SANITARY RISER FOR THE THREE |
| | COMPARTMENT SINK. IT IS EXTREMELY DIFFICULT TO REVIEW. |
| | FBC 107.2.1. |
| | 7) THE WATER RISER SHOWS THE INSTALLATION OF AIR |
| | CHAMBERS. AIR CHAMBERS ARE NOT APPROVED FOR THE CONTROL |
| | OF WATER HAMMER. WATER HAMMER ARRESTORS ARE REQUIRED |
| | AND SHALL COMPLY WITH 2014 FPC SEC.604.9. |
| | 8) IS THIS A CHANGE OF OCCUPANCY? IF SO, THEN TWO |
| | DRINKING FOUNTAINS ARE REQUIRED PER THE FAC. SEC. 211.2 |
| | AND FOOTNOTE # ( E ) OF TABLE 403.1 OF 2014 FPC. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |