| Plan Review Notes For Permit 16030728 |
| Permit Number |
16030728 |
|
| Review Stop |
M |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2016-04-14 07:39:04 | 2ND REVIEW: FBC 2014 MECHANICAL | | | PERMIT #16030728 | | | 4/14/16 | | | | | | 1) SHEET D100 & M100: PLEASE REVISE THE PLAN SHEETS TO | | | INCLUDE DETAILS FOR MECHANICAL DEMOLTION AND | | | RE-CONSTRUCTION, AND PROVIDE A SCOPE OF WORK FOR THE | | | PROJECT . IT APPEARS THAT DUE TO THE RE-CONFIGURATION | | | OF THE UNIT LAYOUT, TWO EXISTING HEAT PUMPS ARE BEING | | | REPLACED IN THE SAME LOCATIONS, AND TWO ADDITIONAL IN | | | NEW LOCATIONS ARE BEING INSTALLED. | | | 2) PROVIDE AC LOAD CALCULATIONS FOR THE NEW HEAT PUMP | | | SYSTEMS- SECTION C403.2.1 FBC-14 ENERGY CONSERVATION. | | | 3) PROVIDE A WATER PIPING LAYOUT PLAN AND PIPING | | | INSTALLATION DETAILS. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|