| 2016-07-20 12:14:25 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | PROGRESS IS BEING MADE AND ALL EFFORTS ARE APPRECIATED; |
| | HOWEVER, LIFE SAFETY CONCERNS REMAIN UNCLEAR. |
| | |
| | |
| | |
| | |
| | 1) A LIFE SAFETY PLAN, DURING CONSTURCTION IS NEEDED TO |
| | ASSIST MY REVIEW OF HOW/WHERE WILL THE RESIDENTS EXIT |
| | DURING CONSTRUCTION. |
| | |
| | IT APPEARS THAT THE HALLWAYS LEADING TO THE SECONDARY |
| | EXIT EGRESS, THE FIRE ESCAPE STAIRS, APPEARS TO BE/WILL |
| | BE BLOCKED BY CONSTURCTION. |
| | |
| | PLEASE PROVIDE DETAIL OF HOW EACH FLOOR WIL HAVE SAFE |
| | TRAVEL TO TWO REMOTE EXITS DURING CONSTUCTION. |
| | |
| | |
| | 2) DUE TO THE NATURE OF THE DEMOLITION AND AGE OF THE |
| | BUILDING I AM CONCERNED REGARDING THE SAFETY OF THE |
| | OCCUPANTS DURING CONSTRUCTION, ESPECIALLY DURING THE |
| | DEMOLITION, POTENTIALLY UNSTABLE STRUCTURE, PERIOD. |
| | |
| | THERE IS NO NOTE/NARRATIVE/STATEMENT/RECOMMENDATION OF |
| | ANYONE WITH THE EXPERTISE AS TO THE CONTINUED OCCUPANCY |
| | OF RESIDENTS OF THE BUILDING DURING THE |
| | DEMOLITION/CONSTRUCTION PERIODS. |
| | |
| | PLEASE PROVIDE SOME SORT OF OFFICIAL SIGNED AND SEALED |
| | DOCUMENTATION FROM A QUALIFIED LICENSED AUTHORITY TO |
| | CONFIRMED/VERIFY THE RESIDENTS SAFETY OCCUPYING THE |
| | BUILDING DURING DEMOLITION/CONSTRUCTION. |
| | |
| | |
| | 3) THERE DOES NOT APPEAR TO BE A NOTE OR NARRATIVE |
| | REAGARDING ALL WORK ON THE FIRE LARM OR FIRE SPRINKLER |
| | SHALL BE DONE BY CERITIFED LIFE SAFETY CONTRACTORS |
| | UNDER SEPARATE SHOP DRAWINGS. |
| | |
| | PLEASE PROVIDE. |
| | |
| | |
| | 4) THE VALUE OF THIS PROJECT $150,000 APPEARS TO BE TOO |
| | LOW, PLEASE PROVIDE VERIFICATION/JUSTIFICATION AND/OR |
| | INCREASE ACCORDINGLY. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |