| 2016-10-26 10:55:37 | 10/26/16 TALKED TO RICHARD BARNES (ARCH.) TO GO OVER |
| | COMMENTS (# OF PEOPLE , A/C SIZING, A/C SEER). |
| | |
| | 10/26/16 TALKED TO TONY PIEDRA (CONTRACTOR) TO GO OVER |
| | COMMENTS AND PROVISO. HE SAID HE'LL RESUBMIT ALONG WITH |
| | LANDSCAPE REQUEST. |
| | |
| | |
| | RESIDENTIAL (R3) ADDITION/ALTERATION BUILDING REVIEW |
| | CHECKLIST. |
| | CODE: FBC-5TH EDITION (2014). |
| | |
| | |
| | NOTE: |
| | BUILDING REVIEW MAY BE APPROVED WITH PROVISO. PROVISO |
| | MEANS THAT CONTRACTOR MAY SUBMIT REQUESTED INFORMATION |
| | AFTER THE PERMIT IS ISSUED AND BEFORE INSPECTIONS TO |
| | AVOID CONFLICTS/DELAYS. REVISION FEES MAY APPLY. |
| | CONTRACTOR TO ADVICE IF RESUBMITTING INFORMATION NOW OR |
| | IF PROVISO OPTION IS PREFERRED AT THIS TIME. |
| | |
| | 1- REVISE ENERGY CALCULATIONS SUBMITTED: |
| | A) PROVIDE COMPLETE AND CORRECT INFORMATION ON TOP OF |
| | FORM, INCLUDING CORRECT OWNER'S NAME ("HOMEOWNER" IS |
| | NOT AN OWNER), BUILDER NAME, PERMIT OFFICE AND |
| | JURISDICTION NUMBER. SEC. R101.5.1.1.2 FBC-ENERGY |
| | CONSERVATION, 5TH EDITION (2014). |
| | |
| | B) REVISE NUMBER OF OCCUPANTS SHOWN UNDER "SPACES" ON |
| | PAGE 2 OF 4. THIS IS A THREE BEDROOM HOUSE. CLARIFY WHY |
| | CONSIDERING ONLY ONE OCCUPANT. THE NUMBER OF OCCUPANTS |
| | MAY AFFECT THE A/C SIZING LOAD CALCULATIONS. A HIGH |
| | NUMBER OF OCCUPANTS MAY RESULT TO OVERSIZE THE A/C |
| | EQUIPMENT. ON THE OTHER HAND, A LOW NUMBER OF OCCUPANTS |
| | MAY RESULT TO UNDERSIZE THE A/C EQUIPMENT. PROVIDE THE |
| | COMPLETE A/C LOAD CALCULATIONS (NOT JUST THE SUMMARY) |
| | TO VERIFY EQUIPMENT SIZING. EQUIPMENT CAN NOT BE |
| | OVERSIZED OR UNDERSIZED. SEE SEC. R403.6.1 AND SEC. |
| | R403.6.1.1 FBC-ENERGY CONSERVATION, 5TH EDITION (2014). |
| | TYPICALLY A THREE BEDROOM HOUSE IS OCCUPIED BY MORE |
| | THAN ONE PERSON. THE PURPOSE OF THE ENERGY CALCULATIONS |
| | AND EQUIPMENT SIZING IS TO CONTRIBUTE TO THE ENERGY |
| | CONSERVATION BY PROPERLY DESIGNING THE STRUCTURE AND |
| | THE EQUIPMENT TO BE USED. IF ONLY USING ONE PERSON FOR |
| | THE DESIGN PARAMETERS, THEN PROVIDE COMPLETE |
| | DOCUMENTATION SUPPORTING THIS DESIGN APPROACH. |
| | DOCUMENTATION WILL BE FORWARDED TO THE BUILDING |
| | OFFICIAL FOR REVIEW AND APPROVAL. |
| | |
| | C) SEC. R806.2 OF FBC-RESIDENTIAL, 5TH EDITION (2014) |
| | REQUIRES 1/150 ATTIC VENTILATION RATIO. ATTIC |
| | INFORMATION ON PAGE 2 OF 4 SPECIFIES 1/300 ATTIC |
| | VENTILATION RATIO. PROVIDE COMPLETE DETAILS AND |
| | SPECIFICATIONS SHOWING HOW THIS HOUSE COMPLIES WITH THE |
| | EXCEPTION OF SEC. R806.2 FOR 1/300 ATTIC VENTILATION |
| | RATIO. OTHERWISE REVISE AS REQUIRED. |
| | |
| | D) REVISE THE WINDOWS OVERHANG DEPTH AND SEPARATION TO |
| | MATCH PLANS. SEC. R101.5.1.1.2 FBC-ENERGY CONSERVATION, |
| | 5TH EDITION (2014). |
| | |
| | E) MISSING THE INSPECTION CHECKLIST AS REQUIRED BY SEC. |
| | R405.4.2 FBC-ENERGY CONSERVATION. |
| | |
| | F) PROVIDE THE NAME OF THE INDIVIDUAL COMPLETING THE |
| | ENERGY CALCULATIONS AS REQUIRED BY SEC. R405.4.2 |
| | FBC-ENERGY CONSERVATION. |
| | |
| | G) BUILDER TO COMPLETE AND PROVIDE THE EPL DISPLAY |
| | CARD. SEC. R405.4.2 FBC-ENERGY CONSERVATION. |
| | |
| | NEW COMMENT: |
| | H) ITEM #12 SPECIFIES 18 SEER FOR THE COOLING |
| | EQUIPMENT. FLOOR PLAN M-1 SPECIFIES 15 SEER. REVISE AS |
| | REQUIRED TO MATCH. SEC. R103.2 FBC-ENERGY CONSERVATION. |
| | |
| | NOTE: LABEL FOR WINDOWS AND DOORS U-FACTOR AND SHGC |
| | FACTOR SPECIFIED ON THE ENERGY CALCULATIONS WILL BE |
| | REQUIRED FOR VERIFICATION. |
| | |
| | ***PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH |
| | COMMENT TO EXPEDITE THE REVIEW PROCESS. |
| | ***PLEASE INSERT ANY REVISED DRAWING AND REMOVE OLD |
| | DRAWINGS. SUBMIT OLD DRAWINGS FOR REFERENCE. DON'T |
| | STAPLE OLD DRAWINGS. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | (561)805-6712 |
| | [email protected] |
| | |
| | 10/26/16 TALKED TO RICHARD BARNES (ARCH.) TO GO OVER |
| | COMMENTS (# OF PEOPLE , A/C SIZING, A/C SEER). |
| | |
| | 10/26/16 TALKED TO TONY PIEDRA (CONTRACTOR) TO GO OVER |
| | COMMENTS AND PROVISO. HE SAID HE'LL RESUBMIT ALONG WITH |
| | LANDSCAPE REQUEST. |