| 2016-03-17 08:46:25 | 1ST REVIEW: |
| | CODES: FBC 2014 MECHANICAL, EXISTING BUILDING, ENERGY |
| | CONSERVATION |
| | PERMIT #16030222 |
| | 3/17/16 |
| | |
| | 1) REFER TO SECTION 809.2 FBC-14 EXISTING BUILDING AND |
| | PROVIDE MINIMUM VENTILATION CALCULATIONS FOR ALL ROOMS |
| | AND SPACES IN ACCORDANCE WITH TABLE 403.3 MECHANICAL. |
| | PROVIDE A SCHEDULE ON THE PLAN THAT INDICATES THE |
| | REQUIRED AND PROVIDED CFM'S OF O/A. |
| | |
| | 2) PROVIDE AC COOLING AND HEATING CALCULATIONS FOR |
| | RTU-9 IN ACCORDANCE WITH SECTION C403.2.1 FBC-14 ENERGY |
| | CONSERVATION. |
| | |
| | 3) THE PROPOSED PROJECT IS CLASSIFIED AS A "RENOVATION" |
| | IN ACCORDANCE WITH SECTION 202 FBC-14 ENERGY |
| | CONSERVATION, AND THEREFORE REQUIRES DOCUMENTATION OF |
| | ENERGY EFFICIENCY COMPLIANCE- SEE SECTIONS C101.4.3, |
| | C101.5.1, AND C401.2. PLEASE SHOW COMPLIANCE USING |
| | EITHER THE PRESCRIPTIVE OR PERFORMANCE BASED COMPLIANCE |
| | PATHS. |
| | |
| | 4) PROVIDE MOTORIZED DAMPERS FOR MTHE O/A TO EACH RTU |
| | THAT WILL AUTOMATICALLY SHUT WHEN THE SYSTEMS AND |
| | SPACES ARE NOT IN USE. |
| | |
| | 5) REFER TO SECTION C403.2.5.1 AND PROVIDE DEMAND |
| | CONTROLLED VENTILATION IN ROOMS AND SPACES WHERE |
| | APPLICABLE. |
| | |
| | 6) PROVIDE A DUCT SMOKE DETECTOR SYMBOL AT THE RETURN |
| | AIR PLENUM, OF RTU-9 AND ALL OTHER SYSTEMS REQUIRING |
| | DETECTORS- SECTION 606.2.1. PLEASE INDICATE A SEQUENCE |
| | OF OPERATION FOR THE DETECTORS- CLARIFY IF ALL SYSTEMS |
| | WILL BE LINKED TOGETHER TO SHUT DOWN UPON |
| | ACTIVATIVATION OF ANY ONE DETECTOR. |
| | |
| | 7) PROVIDE WIND LOAD ENGINEERING FOR TIE-DOWN OF THE |
| | NEW RTU-9 IN ACCORDANCE WITH SECTION 301.15 FBC-14 |
| | MECHANICAL. PROVIDE THE WIND LOAD DESIGN CRITERIA ON |
| | THE PLAN AND SECTION CUTS OF THE UNIT AND CURB SHOWING |
| | THE STRUCTURAL DETAILS- PLEASE NOTE THAT THE DETAIL ON |
| | M2.1 IS INCOMPLETE. |
| | |
| | 8) PROVIDE A ROOF PLAN SHOWING THE LOCATION OF THE NEW |
| | RTU-9 AND CLEARANCE DISTANCE MEASUREMENTS FROM THE AIR |
| | INTAKE TO MECHANICAL AND GRAVITY EXHAUST OUTLETS, AND |
| | FROM THE RTU TO THE ROOF EDGES. |
| | |
| | 9) PROVIDE A CONDENSATE DISPOSAL FOR THE RTU-9 |
| | INDICATING PIPING DETAILS AND DISCHARGE LOCATION. |
| | PLEASE NOTE THAT NO DETAILS ARE SHOWN ON THE PLUMBING |
| | PAGES. |
| | |
| | 10) PROVIDE THE MAIN DUCT SIZES ON THE PLANS FOR RTU-4, |
| | AND SEE SECTION 601.5: PLEASE NOTE THE 10" TRANSFER MAY |
| | BE UNDERSIZED. |
| | |
| | 11) PLEASE CLARIFY IF THE TOILOET ROOM EXHAUST FANS AND |
| | DUCTS ARE BEING REPLACED AND PROVIDE DETAILS AND |
| | EQUIPMENT SCHEDULES IF APPLICABLE. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |