| Date |
Text |
| 2016-03-07 14:37:15 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | 1. SHEET A 3.1 - STORAGE UNDER THE EXIT STAIRS IS |
| | INDICATED. PLEASE PROVIDE INDICATIONS THAT COMPLY WITH |
| | THE REQUIREMENTS OF NFPA 101, CHAPER 7 MEANS OF EGRESS, |
| | 7.2.2.5.3 USABLE SPACE. |
| | |
| | 2. SHEET A 3.1 - THERE ARE WINDOWS INDICATED ALONG THE |
| | EXIT STAIRWAY. PLEASE PROVIDE INDICATIONS THAT COMPLY |
| | WITH THE REQUIREMENTS OF NFPA 101, CHAPER 7 MEANS OF |
| | EGRESS, 7.2.2.6.3 SEPARATION AND PROTECTION OF OUTSIDE |
| | STAIRS. |
| | |
| | 3. SHEET A 5.1 - THERE IS NO STAIR AND/OR HANDRAIL AND |
| | GUARD DETAIL. PLEASE PROVIDE DETAILS THAT COMPLY WITH |
| | THE REQUIREMENTS OF NFPA 101, CHAPER 7 MEANS OF EGRESS, |
| | 7.2.2 STAIRS. |
| | |
| | 4. SHEET A 5.1 - PLEASE PROVIDE DETAILS THAT COMPLY |
| | WITH THE REQUIREMENTS OF NFPA 101, CHAPER 7 MEANS OF |
| | EGRESS, 7.2.2.6.2 VISUAL PROTECTION. |
| | |
| | 4. SHEET A 3.1 - THE WINDOW SCHEDULE DOES NOT HAVE |
| | INFORMATION CORRESPONDING WITH WINDOWS MARKED D, E, F, |
| | OR G. PLEASE PROVIDE. |
| | |
| | 5. FIRE SPRINKLER - THERE IS NO SHEET SHOWING THE |
| | CONCEPTUAL FIRE SPRINKLER PALN. PER FLORIDA |
| | ADMINISTRATIVE CODE SECTION 61G15-32.004, FIRE |
| | PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE |
| | POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF |
| | APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT, |
| | CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR |
| | AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER |
| | SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA) |
| | AND ANY PERFORMANCE BASED INFORMATION SUCH AS |
| | PRE-ENGINEERED SYSTEMS. |
| | |
| | SEPARATE SHOP DRAWINGS SHALL BE SUBMITTED CONFORMING TO |
| | THE ABOVE. |
| | |
| | 6. SHEET A 5.1 - PER FLORIDA 69A-60.0081; NOTICE |
| | SIGNAGE IS REQUIRED FOR STRUCTURES WITH LIGHT-FRAME |
| | TRUSS-TYPE CONSTRUCTION. ANY COMMERCIAL, INDUSTRIAL, OR |
| | ANY MULTIUNIT RESIDENTIAL STRUCTURE OF THREE UNITS OR |
| | MORE WHICH USES HORIZONTAL OR VERTICAL LIGHT-FRAME |
| | TRUSS-TYPE CONSTRUCTION IN ANY PORTION SHALL BE MARKED |
| | WITH A MALTESE CROSS SIGN MEASURING 8 INCHES |
| | HORIZONTALLY AND 8 INCHES VERTICALLY, OF A BRIGHT RED |
| | REFLECTIVE COLOR. THE APPROVED SYMBOL SHALL BE PLACED |
| | WITHIN 24 INCHES TO THE LEFT OF THE MAIN ENTRY DOOR. |
| | A. STRUCTURES WITH LIGHT-FRAME TRUSS ROOFS SHALL BE |
| | MARKED WITH THE LETTER "R". |
| | B. STRUCTURES WITH LIGHT-FRAME TRUSS FLOOR SYSTEMS |
| | SHALL BE MARKED WITH THE LETTER "F". |
| | C. STRUCTURES WITH LIGHT-FRAME TRUSS FLOOR AND ROOF |
| | SYSTEMS SHALL BE MARKED WITH THE LETTERS "R/F". |
| | |
| | 7. SHEET E 1.2 - PROVIDE EXIT SIGNAGE AT THE TOP OF THE |
| | STAIRS PER THE REQUIREMENTS OF NFPA 101, CHAPER 7 MEANS |
| | OF EGRESS, 7.10 MARKING OF MEANS OF EGRESS. |
| | |
| | 8. SHEET E 1.1 - PROVIDE A SMOKE DETECTOR IN THE |
| | IMMEDIATE AREA OUTSIDE EACH BEDROMM IN UNITS 1, 2, AND |
| | 3. |
| | |
| | 9. SHEET E 1.2 - PROVIDE A SMOKE DETECTOR IN THE |
| | IMMEDIATE AREA OUTSIDE EACH BEDROMM IN UNITS 4, 5, AND |
| | 6. |
| | |
| | 10. SHEET E 1.1 & 1.2 - PROVIDE INDICATIONS THAT SMOKE |
| | ALARMS ARE INTERCONNECTED PER NFPA 101, CHAPTER 9 SMOKE |
| | ALARMS, 9.6.2.10.3 |
| | |