| Date |
Text |
| 2016-03-10 15:10:23 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #16030026 |
| | 3/10/16 |
| | |
| | 1) SHEETS M-1 & M-2: A) FLEX DUCTS SHALL NOT PASS |
| | THROUGH THE FIRE-RATED CORRIDOR WALLS OR THE FIRE-RATED |
| | CLASSROOM 305/MEDIA ARTS 302 WALL. |
| | 2) M1 & M2: THE 14X16 TRUNK FROM AHU-2 IS SHOWN ON THE |
| | PLAN TO BE LOCATED ON TOP OF A THE FIRE-RATED CLASSROOM |
| | 305/MEDIA ARTS 302- PLEASE RELOCATE THE DUCT PER |
| | SECTION 607.5.3. |
| | 3) M1 & M2: FIRE DAMPER MISSING AT THE 38X24 RETURN |
| | GRILL LOCATED IN THE FIRE-RATED BACK STAGE/PERFORMANCE |
| | AREA WALL- SECTION 607.5.3. |
| | 4) M1 & M2: THE FIBERGLASS DUCTS PENETRATING THE |
| | FIRE-RATED CORRIDOR PARTITION ARE PERMITTED TO BE |
| | INSTALLED WITHOUT DAMPERS BUT REQUIRE STEEL SLEEVES PER |
| | SECTIONS 607.1.1 & 607.5.3 FBC-14 MECHANICAL. |
| | 5) A-1.1 & M-2: THE SCOPE OF WORK OUTLINE ON A-1.1 DOES |
| | NOT INCLUDE THE STORAGE ROOM, HOWEVER AC IS BEING |
| | SUPPLIED TO IT ON M-2. |
| | 6) M-1 & M-2: PLEASE PROVIDE NOTES #7 & 15 ON THE |
| | PLANS. |
| | 7) M-2: THE PLAN INDICATES A TOTAL OF 4800 CFM RETURN |
| | AIR FROM THE PERFORMANCE AREA TO AHU-3, HOWEVER THE |
| | TOTAL SUPPLY AIR TO THE AREA IS 6280 CFM- PLEASE |
| | CLARIFY. |
| | 8) THE ENERGY CONSERVATION FORM LISTS AHU/CU-1 & 2, |
| | HOWEVER THE PLAN IS INDICATING AHU/CU- 2 & 3- PLEASE |
| | CORRECT. |
| | 9) SUBMIT MANUFACTURER'S SPECIFICATIONS AND MIAMI-DADE |
| | NOA'S FOR THE GREENHECK GRAVITY INTAKE VENTILATOR |
| | REVIEWED AND APPROVED WITH SIGNATURE BY THE EOR. |
| | 10) PROVIDE A ROOF PLAN INDICATING THE REQUIRED |
| | CLEARANCE DISTANCE MEASUREMENTS FROM THE AIR INTAKES TO |
| | EXHAUST AND VENT OUTLETS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |