| 2016-03-11 15:34:29 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #16020738 |
| | 3/11/16 |
| | |
| | 1) DUCT SMOKE DETECTORS ARE REQUIRED IN THE RETURN AIR |
| | SYSTEMS OF RTU'S 1, 2, 3, 4, 7, 8, 9, 10, 11 PER |
| | SECTION 606.2.1. PROVIDE AN INSTALLATION DETAIL ON THE |
| | PLAN AND INDICATE HOW THE DEVICES WILL BE SUPERVISED- |
| | SECTION 606.4.1. |
| | 2) M2.1: IT APPEARS THAT MAIN DUCT DROP SYMBOLS ARE |
| | MISSING FOR RTU'S 1 & 2. |
| | 3) M2.2: RTU-2 IS MISLABELED AS RTU-5. |
| | 4) M2.2: THE PLAN SHEET IS MISLABELED AS "2ND FLOOR |
| | DOMESTIC WATER PLAN". |
| | 5) PROVIDE A MECHANICAL ROOF PLAN SHOWING THE LOCATIONS |
| | OF ALL RTU'S, EXHAUST FANS, AND AIR INTAKE OPENINGS. |
| | 6) PROVIDE WIND LOAD ENGINEERING FOR TIE DOWN OF THE |
| | RTU'S, EXHAUIST FANS, AND THE CURBS- SEE STRUCTURAL |
| | COMMENTS AND SECTION 301.15 FBC-10 MECHANICAL. |
| | 7) INDICATE IF A ROOF LADDER OR OTHER MEANS IS EXISTING |
| | FOR ACCESS TO THE ROOF TOP EQUIPMENT- SECTION 306.5. |
| | 8) PROVIDE SHUTOFF DAMPER CONTROLS FOR THE O/A INTAKES- |
| | SECTION C403.2.4.4 FBC-14 ENERGY CONSERVATION. |
| | 9) REFER TO SECTION C408 FBC-14 ENERGY CONSERVATION: |
| | COMMISSIONING OF THE MECHANICAL AND ELECTRICAL POWER |
| | AND LIGHTING SYSTEMS IS REQUIRED. PLEASE REVIEW ALL |
| | SUB-SECTIONS AND SUBMIT A COMMISSIONING PLAN PER |
| | SECTION C408.2.1. |
| | 10) THERE ARE 12 AC SYSTEMS SHOWN ON THE PLANS |
| | EXCLUDING THE EXISTING SYSTEM, HOWEVER THERE ARE ONLY |
| | 10 SYSTEMS ACCOUNTED FOR IN THE ENERGY CONSERVATION |
| | FORM. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |