| 2016-03-04 18:34:18 | RESIDENTIAL (R3) ALTERATIONS MECHANICAL REVIEW |
| | COMMENTS. |
| | CODE: FBC-5TH EDITION (2014). |
| | |
| | 1- THERE ARE TWO STRUCTURES SHOWN ON PLANS SUBMITTED. |
| | CONTRACTOR SUBMITTED ONLY MECHANICAL INFORMATION FOR |
| | THE MAIN HOUSE. IF MECHANICAL WORK IS PROPOSED FOR THE |
| | GARAGE CONVERSION, THEN PROVIDE COMPLETE INFORMATION |
| | UNDER SEPARATE PERMIT APPLICATION. SEC. 105.1 AND SEC. |
| | 107.2.1.4 CITY AMENDMENTS. |
| | |
| | 2- REVISE THE EQUIPMENT SIZING CALCULATIONS SUBMITTED: |
| | A) COORDINATE EQUIPMENT SIZING CALCULATIONS WITH THE |
| | INFORMATION ON THE ENERGY CALCULATIONS REQUIRED BY ITEM |
| | #3 OF BUILDING REVIEW COMMENTS. SEC. R103.2 OF |
| | FBC-ENERGY CONSERVATION, 5TH EDITION (2014). |
| | |
| | B) HOME ADDRESS IS INCORRECT. SEC. 107.2.1 CITY |
| | AMENDMENTS. |
| | |
| | C) NUMBER OF BEDROOMS IS INCORRECT. SEC. R103.2 OF |
| | FBC-ENERGY CONSERVATION, 5TH EDITION (2014). |
| | |
| | D) SQUARE FOOTAGE DOESN'T MATCH SQUARE FOOTAGE SHOWN ON |
| | ENGINEER'S PLANS. SEC. R103.2 OF FBC-ENERGY |
| | CONSERVATION, 5TH EDITION (2014). |
| | |
| | E) CLARIFY WHY THE NUMBER OF OCCUPANTS IS 9. HOW MANY |
| | OCCUPANTS ARE CONSIDERED PER BEDROOM?. NUMBER OF |
| | OCCUPANTS DOESN'T MATCH NUMBER SHOWN ON THE REPORT |
| | INVESTMENT #2 AND #3. .SEC. R103.2 OF FBC-ENERGY |
| | CONSERVATION, 5TH EDITION (2014). |
| | |
| | F) WINDOWS INFORMATION IS INCORRECT. SEC. R103.2 OF |
| | FBC-ENERGY CONSERVATION, 5TH EDITION (2014). |
| | |
| | G) ENGINEER PLANS DON'T SHOW ANY GAS WATER HEATER. SEC. |
| | R103.2 OF FBC-ENERGY CONSERVATION, 5TH EDITION (2014). |
| | |
| | H) PROJECT SUMMARY IS MISSING THE SELECTED EQUIPMENT |
| | SENSIBLE COOLING, LATENT COOLING AND TOTAL COOLING |
| | CAPACITY. SEC. R403.6.1 OF FBC-ENERGY CONSERVATION, 5TH |
| | EDITION (2014). |
| | |
| | 3- A/C PLAN SUBMITTED: |
| | A) THERE IS A DISCREPANCY WITH THE ENGINEER PLANS AND |
| | THE A/C PLAN. COORDINATE WITH THE ENGINEER OF RECORD |
| | AND CLARIFY WHY THE NEW FLOOR PLAN CALLS FOR "FAMILY |
| | AND BATHROOM ALTERATION" WHILE THE MECHANICAL PLAN |
| | CALLS THIS ROOM "MASTER BEDROOM AND MASTER BATH". IT'S |
| | IMPORTANT TO DEFINE THE PROPOSED USE OF THIS ROOM TO |
| | MAKE THE PROPER BUILDING REVIEW. REVISE AS REQUIRED TO |
| | MATCH. SEC. 107.2.1 CITY AMENDMENTS. |
| | NOTE: THIS WILL ALSO AFFECT THE INFORMATION ON THE |
| | EQUIPMENT SIZING CALCULATIONS AND A/C PLAN. COORDINATE |
| | AS REQUIRED TO AVOID CONFLICTS. |
| | |
| | 4- MASTER BEDROOM TRANSFER GRILL SIZE DOESN'T COMPLY |
| | WITH THE BALANCED RETURN AIR SEC. M1602.4 OF |
| | FBC-RESIDENTIAL, 5TH EDITION (2014). NOTE: KEEP IN MIND |
| | THAT THE SIZE OF THE GRILL IS BASED ON ALL THE SUPPLY |
| | AIR TO THE MASTER BEDROOM AND MASTER BATHROOM. |
| | |
| | 5- ADDITIONAL BEDROOMS: PROVIDE COMPLIANCE WITH THE |
| | BALANCED RETURN AIR SEC. M1602.4 OF FBC-RESIDENTIAL, |
| | 5TH EDITION (2014). |
| | |
| | 6- PROVIDE THE NAME AND SIGNATURE OF THE PERSON |
| | RESPONSIBLE FOR THE DESIGN AS REQUIRED BY SEC. 107.2.1 |
| | CITY AMENDMENTS. |
| | |
| | ***PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH |
| | COMMENT TO EXPEDITE THE REVIEW PROCESS. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | (561)805-6712 |
| | [email protected] |
| | |
| | |