| 2016-04-04 11:58:55 | ****CORRECTIONS**** |
| | |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | 1. THE GEOTECHNICAL REPORT IS TO BE REVIEWED BY |
| | ENGINEER OF RECORD, FBC 107, FAC61G15-23. THIS MAY BE |
| | DEMONSTRATED BY PROVIDING THE PLAN PAGE WITH THE |
| | GEOTECHNICAL REPORT REFERENCE (IF APPLICABLE), A SHOP |
| | DRAWING REVIEW STAMP, OR A LETTER. |
| | |
| | 2. PROVIDE INFORMATION REGARDING WHO WILL SUPERVISE THE |
| | PROPOSED WORK, FBC 110. PROVIDE A RESUME FOR THAT |
| | COMPANY AND INDIVIDUAL. |
| | |
| | 3. PROVIDE A CONTRACTOR RESUME WHICH INCLUDES SIMILAR |
| | PROJECTS, FBC 105. |
| | |
| | 4. DELEGATED ENGINEERING IS TO BE REVIEWED BY ENGINEER |
| | OF RECORD, FAC61G15-23. |
| | |
| | 5. REVISE PLAN TO INCLUDE THE GOVERNING CODE, FBC 107. |
| | |
| | 6. PROVIDE A SITE PLAN WHICH SHOWS LOCATION OF PROPOSED |
| | WORK, FBC 107. |
| | |
| | 7. THE ADDRESS FOR THIS JOB APPEARS TO BE ONLY ONE LOT |
| | OF SEVERAL FOR THIS PROJECT. PLEASE ADVISE; IS A |
| | RE-PLAT OR UNITY OF TITLE PENDING? FOR RECORD KEEPING |
| | PURPOSES, THE POLICY OF THIS DEPARTMENT IS THAT A |
| | SEPARATE PERMIT IS REQUIRED FOR EACH PARCEL. NOT ENOUGH |
| | INFORMATION HAS BEEN PROVIDED TO RESOLVE THIS ISSUE. |
| | |
| | 8. FBC 105.13, AFTER SUBMITTAL OF THE APPROPRIATE |
| | CONSTRUCTION DOCUMENTS, THE BUILDING OFFICIAL IS |
| | AUTHORIZED TO ISSUE A PERMIT FOR THE CONSTRUCTION OF |
| | FOUNDATIONS OR ANY OTHER PART OF A BUILDING OR |
| | STRUCTURE BEFORE THE CONSTRUCTION DOCUMENTS FOR THE |
| | WHOLE BUILDING OR STRUCTURE HAVE BEEN SUBMITTED. THE |
| | HOLDER OF SUCH PERMIT FOR THE FOUNDATION OR OTHER PARTS |
| | OF A BUILDING OR STRUCTURE SHALL PROCEED AT THE |
| | HOLDER?S OWN RISK WITH THE BUILDING OPERATION AND |
| | WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE |
| | STRUCTURE WILL BE GRANTED. CORRECTIONS MAY BE REQUIRED |
| | TO MEET THE REQUIREMENTS OF THE TECHNICAL CODES. THIS |
| | PROVISION IS ONLY FOR THE FLORIDA BUILDING CODE, ALL |
| | OTHER AGENCY APPROVALS NECESSARY FOR CONSTRUCTION MUST |
| | BE SECURED PRIOR TO THIS PROVISION BEING APPLIED. |
| | |